background image

P 5

Please retain product label and instructions for future reference

             

Lay the Felt 

(No. 17) 

onto the roof as shown in the diagram.

Ensure there is 50mm of overhang around each side. 

Fix in place using felt tacks at 100mm internvals.  

Step 8

HANDLE

WITH CARE

1

2

3

4

18

Parts Needed - No. 18 Qty 1

Cut one strip of felt 

(No. 18) 

to 

2350mm

 

and place it over the roof. Fix 

the felt in place with felt tacks spaced 

100mm apart.

Ensure there is 50mm of overhang 

around each side. 

30 x Felt Tacks

Felt 

tacks 

Step 9

Parts Needed - No. 7 Qty 4

 

 

   No. 13 Qty 2

Attach the fascias 

(No. 7)

 to the front 

and back of the building ensuring to 

trap the felt between the gable and the 

fascia. Use 3 x 30mm screws per fascia 

ensuring to fix through to the panel 

framing behind.

Attach the finial 

(No. 13) 

to the fascias 

at the fornt and the back of the 

building using 2 x 30mm screws per 

finial.

16 x 30mm Screws

IMPORTANT: 

Pre-drill before fixing screws.

30mm 

screw

Pre drill 

hole

7

13

13

7

7

7

Step 10

Parts Needed - No. 8 Qty 4

Attach the cover trims 

(No. 8)

 to the 

front and back of the building as shown 

in the illustration. Use 3 x 30mm screws 

per cover trim ensuring to fix through 

to the panel framing behind.

12 x 30mm Screws

IMPORTANT: 

Pre-drill before fixing screws.

30mm 

screw

Pre drill 

hole

8

8

8

Содержание 05DTOVAX0307DD-V1

Страница 1: ...moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered...

Страница 2: ...over Trim 7 x 45 x 1324mm Qty 4 S745 1324MM 10 Eaves Frame 28 x 28 x 825mm Qty 2 F2828 825MM 11 Ridge Bar 28 x 28 x 744mm Qty 1 F2828 744M 9 Door Trim 12 x 27 x 1261mm Qty 2 S1227 1261MM 2 3 1 Door Ga...

Страница 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 4 14 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 6 Qty 2 Place the floors No 6 on a firm and level base ensure the...

Страница 4: ...for each end Secure in place using 4 x 30mm screws per L Bracket 8 x 30mm Screws Pre drill hole 50mm screw 17 11 11 17 Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 5 Qty 2 No 10 Qt...

Страница 5: ...ty 2 Attach the fascias No 7 to the front and back of the building ensuring to trap the felt between the gable and the fascia Use 3 x 30mm screws per fascia ensuring to fix through to the panel framin...

Страница 6: ...he top and bottom of the door using a 30mm screw per turn button 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 16 16 16 Step 13 Parts Needed No 9 Qty 2 Locate the...

Страница 7: ...P 7 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled...

Страница 8: ...2 1 3 4...

Страница 9: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: