background image

P 7

Please retain product label and instructions for future reference

             

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Содержание 05DTOVAX0307DD-V1

Страница 1: ...moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered...

Страница 2: ...over Trim 7 x 45 x 1324mm Qty 4 S745 1324MM 10 Eaves Frame 28 x 28 x 825mm Qty 2 F2828 825MM 11 Ridge Bar 28 x 28 x 744mm Qty 1 F2828 744M 9 Door Trim 12 x 27 x 1261mm Qty 2 S1227 1261MM 2 3 1 Door Ga...

Страница 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 4 14 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 6 Qty 2 Place the floors No 6 on a firm and level base ensure the...

Страница 4: ...for each end Secure in place using 4 x 30mm screws per L Bracket 8 x 30mm Screws Pre drill hole 50mm screw 17 11 11 17 Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 5 Qty 2 No 10 Qt...

Страница 5: ...ty 2 Attach the fascias No 7 to the front and back of the building ensuring to trap the felt between the gable and the fascia Use 3 x 30mm screws per fascia ensuring to fix through to the panel framin...

Страница 6: ...he top and bottom of the door using a 30mm screw per turn button 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 16 16 16 Step 13 Parts Needed No 9 Qty 2 Locate the...

Страница 7: ...P 7 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled...

Страница 8: ...2 1 3 4...

Страница 9: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: