background image

P 3

Please retain product label and instructions for future reference

             

Nail Bag

50mm Screw x 63 

40mm Screw x 18 

Felt Tacks x 100

20mm Screw x 36

30mm Screw x 98

20mm Black Screw x 10

10mm Screw x 8

30mm Black Screw x 48

Pre Assembly

Remove the transportation blocks 

from the bottom and top of each 

panel before beginning assembly.

5

Step 1

 

Place both Floor panels 

(No. 5)

  framing 

side up onto a flat, level base, ensuring 

the base has suitable drainage, free from 

areas where standing water can collect.

Ensure the floor panels  in-line and flush 

with each other. Secure together by 

screwing through the framing using 

10x50mm screws. 

Then return the panels to the correct 

side up.

*Ensure to stagger screws to avoid 

collision.  

10x50mm screws

.

Pre drill 

hole

50mm 

screw

5

Step 2

 

Place the Plain Gable 

(No. 2)

 and one 

Plain Panel 

(No. 3)

 onto the Floor. 

Secure the Panels together with 

3x50mm screws as shown.

**Do not fix to the Floor until the 

Roof is fiitted.

 

3x50mm screws. 

Pre drill 

hole

50mm 

screw

3

2

Содержание 03WES1008-V3

Страница 1: ...the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is sugge...

Страница 2: ...Support 27x70x619mm QTY 2 F2770 G 659mm ANGLED 27 28 L Bracket QTY 2 PI 07 0012 U Channel QTY 2 PI 07 0013 Door Gable QTY 1 AI 03WESDG2298X2206 V3 Plain Gable QTY 1 AI 03WESG2298X2206 V3 Veranda QTY1...

Страница 3: ...flat level base ensuring the base has suitable drainage free from areas where standing water can collect Ensure the floor panels in line and flush with each other Secure together by screwing through...

Страница 4: ...4 Fix the remaining Window panel No 4 and Plain Panel No 3 into position with 3x50mm per panel Plain panels and Window panels are interchangable Do not fix to the Floor until the Roof is fiitted 6x50...

Страница 5: ...the gaps of the gable framing Make sure the 12mm overhang is at the apex of the building Do not fix to the Floor until the Roof is fiitted 7 Pre drill hole 50mm screw Step 9 Place Roof panel B No 12...

Страница 6: ...m screws as shown Do not fix to the Floor until the Roof is fiitted 2x50mm screws Pre drill hole 50mm screw 14 7 12 Step 12 Fix the next side of the Roof and Veranda Upright in the same way The previo...

Страница 7: ...g will need to be cut to fit at angle Repeat for the rear of the building 40x30mm screws Pre drill hole 30mm screw 16 16 16 16 Cut down trims to fit Step 15 Fix the Rails No 8 to the building by Screw...

Страница 8: ...require cutting down to length 6x30mm screws Pre drill hole 30mm screw 15 15 Cut down trims to fit Step 18 To fix the Window No 11 into the Window Panel No 4 first fix the Window Blocks No 25 to the...

Страница 9: ...hinge 48x30mm black screws Pre drill hole 30mm screw 23 9 10 Step 20 Fix the Fascias No 13 to the building with 3x30mm screws per Fascia 12x30mm screws Pre drill hole 30mm screw 13 13 13 13 Step 21 Fi...

Страница 10: ...ch door externally using 1x20mm black screw per Button 2x20mm black screws Pre drill hole 30mm screw 24 Step 20 Locate the Window Crosses No 17 No 18 into the windows Fix by screwing through the Cross...

Страница 11: ...P 11 AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled...

Страница 12: ...2 1 3 4...

Страница 13: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: