background image

03WES0808-V1

8X8 SUMMERHOUSE, T&G ROOF AND FLOOR, DOUBLE DOORS, OPENING WINDOW

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Содержание 03WES0808-V1

Страница 1: ...d with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL...

Страница 2: ...Window 20 12 13 14 15 16 17 18 19 Veranda Support 27x44x1685mm Qty 2 Fascia 12x95x1549mm Qty 4 Door Strip 12x60x800mm Qty 2 Window Strip 12x45x1055mm Qty 1 Tower Bolt Strip 19x45x140mm Qty 2 Cover Tr...

Страница 3: ...ure a flush fit Attach window beading with the 25mm glazing pins provided x4 pins per beading When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scr...

Страница 4: ...30mm screws 15 15 Pre drill hole 30mm screw Step 4 Place the floor on a firm and level base ensure base has suitable drainage free from areas where standing water can collect See front page on base re...

Страница 5: ...ar Secure the panels in place using 50mm screws through the roof panels into the gable blocks and into the side panels Pre drill hole 50mm screw 7 7 Step 8 16x50mm Screws Once the roof is fixed attach...

Страница 6: ...ws 10 13 13 10 Fit the Cover Trims to the left and right hand side of the building as shown in the illustration using 30mm screws Trim the length of the cover trims to the required size before fitting...

Страница 7: ...0mm screw 16mm screw 30mm screw Place the opening window strip 11mm above the window gap in the window panel and fix with 3x30mm screws If you would like the windows to be opening use the hinges to at...

Страница 8: ...0mm screws 6x20mm screws per casement stay 27 Step 15 Step 16 Attach the Tower Bolt Strip to top and bottom of the slave door with 2x30mm screws Align tower bolts onto blocks and fix with 6x30mm black...

Страница 9: ...al the turn button catches the master door 2x30mm black screws These turn buttons help to keep your doors straight during high levels and low levels of moisture content in the air 30mm screw Pre drill...

Отзывы: