P 4
Please retain product label and instructions for future reference
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Step 2
Fix the door beading
strips to the door gable
using 4x40mm screws
for each strip.
Make sure to attatch the
strips by screwing into
the door gable through
the strip.
12 x 30mm screws
20
19
19
Pre drill
hole
30mm
screw
Step 3
Fix the door strips to the
master door using
3x30mm screws per strip.
6 x 30mm screws
15
15
Pre drill
hole
30mm
screw
Step 4
Place the
floor
on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water can
collect. (See front page on base
requirements).
5
Step 5
3 x 50mm Screws
2
3
Pre drill
hole
50mm
screw
Do not secure the building to the
floor until the roof is fitted. Fix the
panels onto the floor using 50mm
screws in alignment with the floor
joists
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
3x50mm Screws