![Mercia Garden Products 03TGCOR0909DDFW-V1 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/mercia-garden-products/03tgcor0909ddfw-v1/03tgcor0909ddfw-v1_manual_1772541007.webp)
P 7
Please retain product label and instructions for future reference
Step 11
Before fixing the two roof panels
(No. 7 & 8)
together place them
both on a level surface framing
side up (as illustrated).
Fix the two roofs
(No. 7 & 8)
together using 50mm screws as
shown making sure to alternate
which side you fix from.
8x50mm Screws
50mm
screw
Pre drill
hole
7
8
*It is recommended that
you cut the felt before
fitting the roof to the
building*
18
15
35
40mm
screw
Pre drill
hole
Step 12
Attach the front
(No. 18)
and
rear roof framing
(No. 15)
to the
roof as shown in the illustration
using 6x30mm screws.
*Ensure to fix the framing the
opposite direction to the roof
bearers.
Fix the locating blocks
(No. 35)
to the opposing sides to the roof
framing (these blocks are to help
square the roof when fitted).
10x40mm Screws
Step 13
Place the assembled roof onto the
building, ensure that the roof is
equally spaced all the way around
the building.
Fix the roofs in place using 60mm
screws around the edge ensuring
all screws go through the roof
into the panel framing below. Fix
the roofs to the roof support bar
using 60mm screws.
21x60mm Screws
60mm
screw
Pre drill
hole
Step 14
Fix the building to the floor
using 50mm screws as shown
in the illustration.
22x50mm Screws
Pre drill
hole
D
D D
D D
D
D
D
D
D
D
D
D
50mm
screw
Содержание 03TGCOR0909DDFW-V1
Страница 11: ...2 1 3 4...
Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...