Mercia Garden Products 03TGCOR0909DDFW-V1 Скачать руководство пользователя страница 6

P 6

Please retain product label and instructions for future reference

             

Step 8

Place the large gable right 

(No. 3)

 up to 

the window side 

(No. 1)

 as shown in 

the illustration. Fix in place using 

3x50mm screws.

Line the small plain gable right 

(No. 4) 

up with the large plain gable right 

(No. 

3) 

and fix together using 3x50mm 

screws alternating the direction of the 

screw.

Fix the rear panel frame 

(No. 17) 

to the 

end of the small plain gable right using 

3x50mm screws.

10x50mm Screws

a

3

a

a

a

4

b

b

b

b

b

Pre drill 

hole

50mm 

screw

Step 9

Place the plain gable  

(No. 16)

  

framing on top of the left 

gables, ensure the framing sits 

flush with the gable framing 

and fix in place with 4x50mm 

screws.

Place the front right window 

framing 

(No. 19)

  on top of the 

window panel opposite the left 

gables, ensure the framing sits 

flush with the window panel 

framing and fix in place with 

3x50mm screws.

7x50mm Screws

Pre drill 

hole

50mm 

screw

16

19

Step 10

Fix an L bracket 

(No. 32)

   flush to 

each end of the roof support 

(No. 

13)

  using 2x30mm screws for 

each bracket. Position the roof 

support 

(No. 13)

 in-between the 

left gables and the window panel 

opposite. 

Line the roof support up so it sits 

centrally at the panel join and fix 

in place with 2x30mm screws. 

Make sure the roof support sits 

centrally to the window upright 

shown in the illustration. Fix  in 

place with 2x30mm screws.

8x30mm Screws

Pre drill 

hole

30mm 

screw

13

32

32

Содержание 03TGCOR0909DDFW-V1

Страница 1: ...extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prev...

Страница 2: ...03TGCORPGR1417X2017 V1 Large Gable Left QTY 1 AI 03TGCORPGL1389X2094 V1 Small Gable Left QTY 1 AI 03TGCORPGL1417X2017 V1 Large Roof QTY 1 AI 03TAGROOF1685X2889 V1 Small Roof QTY 1 AI 03TAGROOF1204X288...

Страница 3: ...PI 07 0114 Press Lock QTY 1 PI 07 0162 Rounded Butt Hinge QTY 6 PI 07 0066 L Bracket QTY 2 PI 07 0012 Chrome Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 34 35 Locating Block 28x28x239mm QTY 2...

Страница 4: ...the doors using 25mm screws Ensuring the doors are positioned equally fix the hinges to the door panel using 30mm screws 18x25mm Screws 18x30mm Screws Pre drill hole 2 11 12 31 30mm screw 25mm screw...

Страница 5: ...corners together with 3x 60mm screw a shown in diagram Do not fix the panels to the floor untill the roof has been fitted 3x60mm Screws c Pre drill hole 60mm screw 5 17 Pre drill hole Step 7 Place the...

Страница 6: ...e framing sits flush with the gable framing and fix in place with 4x50mm screws Place the front right window framing No 19 on top of the window panel opposite the left gables ensure the framing sits f...

Страница 7: ...n the illustration using 6x30mm screws Ensure to fix the framing the opposite direction to the roof bearers Fix the locating blocks No 35 to the opposing sides to the roof framing these blocks are to...

Страница 8: ...e fascia width as guide for overhang Fix each sheet using felt tacks along where sheet overlap Use felt tacks at 100mm intervals 200x10mm felt tacks Step 15 HANDLE WITH CARE 1 2 3 4 100cm 20cm 20cm 20...

Страница 9: ...s No 22 to the window sides of the building using 3x40mm screws per fascia Fit the fascia No 21 to the front of the building using 3x40mm screws 19x40mm Screws Step 18 22 40mm screw Pre drill hole 22...

Страница 10: ...refuly peel covering back Step 21 Attach the remaining rain guard No 14 above the doors fixing in place using 3x60mm 3x60mm Screws 60mm screw 14 14 Pre drill hole Step 22 On the inside of the building...

Страница 11: ...2 1 3 4...

Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: