P 10
Please retain product label and instructions for future reference
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 21
Attach the remaining rain
guard
(No. 14)
above the
doors, fixing in place using
3x60mm
3x60mm Screws
60mm
screw
14
14
Pre drill
hole
Step 22
On the inside of the building fix
the Door Frame Strips
(No. 26
& 27)
, to the top and sides of
the doors frames. Make sure
that the edges are flush with
the edge of the framing. Fix
with 4x30mm screws per strip.
12x30mm Screws
Pre drill
hole
30mm
screw
27
26
26
27
26
Содержание 03TGCOR0909DDFW-V1
Страница 11: ...2 1 3 4...
Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...