background image

03TGCOR0909DDFW-V1

9x9 Corner Summerhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips 

screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for 

maintenance, annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree 

causing damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of 

heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also 

occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended 

periods of warm sunshine and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to 

prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guaran-

tee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof 

treatment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The 

cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of 

childrens products independently tested to EN71 level, we cannot accept responsibility for your safety 

whilst erecting or using this product.

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

Содержание 03TGCOR0909DDFW-V1

Страница 1: ...extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prev...

Страница 2: ...03TGCORPGR1417X2017 V1 Large Gable Left QTY 1 AI 03TGCORPGL1389X2094 V1 Small Gable Left QTY 1 AI 03TGCORPGL1417X2017 V1 Large Roof QTY 1 AI 03TAGROOF1685X2889 V1 Small Roof QTY 1 AI 03TAGROOF1204X288...

Страница 3: ...PI 07 0114 Press Lock QTY 1 PI 07 0162 Rounded Butt Hinge QTY 6 PI 07 0066 L Bracket QTY 2 PI 07 0012 Chrome Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 34 35 Locating Block 28x28x239mm QTY 2...

Страница 4: ...the doors using 25mm screws Ensuring the doors are positioned equally fix the hinges to the door panel using 30mm screws 18x25mm Screws 18x30mm Screws Pre drill hole 2 11 12 31 30mm screw 25mm screw...

Страница 5: ...corners together with 3x 60mm screw a shown in diagram Do not fix the panels to the floor untill the roof has been fitted 3x60mm Screws c Pre drill hole 60mm screw 5 17 Pre drill hole Step 7 Place the...

Страница 6: ...e framing sits flush with the gable framing and fix in place with 4x50mm screws Place the front right window framing No 19 on top of the window panel opposite the left gables ensure the framing sits f...

Страница 7: ...n the illustration using 6x30mm screws Ensure to fix the framing the opposite direction to the roof bearers Fix the locating blocks No 35 to the opposing sides to the roof framing these blocks are to...

Страница 8: ...e fascia width as guide for overhang Fix each sheet using felt tacks along where sheet overlap Use felt tacks at 100mm intervals 200x10mm felt tacks Step 15 HANDLE WITH CARE 1 2 3 4 100cm 20cm 20cm 20...

Страница 9: ...s No 22 to the window sides of the building using 3x40mm screws per fascia Fit the fascia No 21 to the front of the building using 3x40mm screws 19x40mm Screws Step 18 22 40mm screw Pre drill hole 22...

Страница 10: ...refuly peel covering back Step 21 Attach the remaining rain guard No 14 above the doors fixing in place using 3x60mm 3x60mm Screws 60mm screw 14 14 Pre drill hole Step 22 On the inside of the building...

Страница 11: ...2 1 3 4...

Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: