HANDLE
WITH CARE
1
2
3
4
Please retain product label and instructions for future reference
Step 19
Cut the Felt (
No. 34
) into 3 sheets and lay
onto the roof.
*Ensure there is approximately 50mm of
overhang around the building.
Fix into place using 165x felt tacks at
100mm intervals.
165x Felt tacks Felt Length 3224mm
34
Step 20
Fix the Fascias (4x
No. 29
and 2x
No. 30
)
into position as shown.
No. 30
are for the front and
No. 29
are
for the side.
Fix in place using 18x30mm screws.
18x30mm Screws
Step 21
Fix the Cover Trims (
No. 23,
2x
No. 24,
No. 25, No.26, No.27
and 2x
No. 28
) into
position as shown.
Fix each strip into position using 3x30mm
screws per trim.
24x30mm Screws
29
30
27
28
26
24
28
23
24
25
P 10
Felt tacks
29
29
29
30
Pre drill
hole
30mm
screw
Pre drill
hole
30mm
screw
1.
2.
3.