Step 17a

Once the Roof is aligned and secure the 

Floor can be fixed into postion.

Fix the building into place by screwing 

through the panel into the floor making 

sure to screw into the floor bearers.

*External panels not shown

15x50mm Screws

Step 17b

Continue to fix the building into place by 

screwing through the panel into the floor 

making sure to screw into the floor bearers.

*External panels not shown

11x50mm Screws

 

Step 18

Place the Under Roof(

No. 13

) into position,

making sure it is flush to the Door panel

and Storage section.

Fix in place making sure to screw through 

the Roof framing.  Pre-drill holes first.

10x30mm Screws

Pre drill 

hole

50mm 

screw

Pre drill 

hole

50mm 

screw

Pre drill 

hole

30mm 

screw

P 9

13

Содержание 03LBRO1008-V7

Страница 1: ...with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed En...

Страница 2: ...Cover Trim C 12x56x2011mm Cover Trim D 12x56x2040mm Cover Trim E 12x56x2070mm 2x Cover Trim F 12x56x2080mm 4x Front Fascia 12x134x1250mm 2x Side Fascia 12x134x1557mm F2828 400mm S12134 1557mm Fixing...

Страница 3: ...ecure the floor No 6 to the Floor Blocks No 22 and 10x30mm screws per floor 10x30mm Screws Pre drill hole 30mm screw Pre drill hole 30mm screw 6 22 Step 2 Place the 2 floor panels No 6 onto a firm and...

Страница 4: ...secure the building to the Floor until the roof is fitted 3x50mm Screws Step 6 Fix the side of the Internal Panel No 5 against the framing of the Back Panel No 2 with 3x50mm screws as shown in diagra...

Страница 5: ...reful to ensure positions of screws do not interfere with previously placed screws 3x50mm Screws Step 10 Fix the side of the Side Panel No 10 against the framing of the Storage Back Panel No 8 with 3x...

Страница 6: ...mm Screws Pre drill hole 30mm screw External Aeriel view Internal Slave Door Plain Door Frame 40 17 17b Step 12b Fix the hinges No 40 to the Slave door plain door No 17 17b and attach to the door fram...

Страница 7: ...by side and fix together with 3x70mm screws as shown in the diagram to secure the two Verandas together 3x70mm Screws 14 14 Step 13 Place the Storage Door panel No 9 against the end of the Storage Gab...

Страница 8: ...Panels so they sit square before fixing into postion Do not secure the building to the Floor until the roof is fitted 7 Pre drill hole 50mm screw P 8 7 Step 15 Place the assembled Verandas No 14 flush...

Страница 9: ...n 15x50mm Screws Step 17b Continue to fix the building into place by screwing through the panel into the floor making sure to screw into the floor bearers External panels not shown 11x50mm Screws Step...

Страница 10: ...elt tacks Felt Length 3224mm 34 Step 20 Fix the Fascias 4x No 29and 2x No 30 into position as shown No 30are for the front and No 29are for the side Fix in place using 18x30mm screws 18x30mm Screws St...

Страница 11: ...2x45mm Bolt 3x30mm Screws Pre drill hole 30mm screw 36 Step 22 To fix the lock to the Shed Door first fix the Door Blocks No 33 either side of the centre framing of the Door with 4x40mm screws Once t...

Страница 12: ...ombi Summerhouse 30mm screw Button Step 24 Attach two Turn Buttons No 42 to the Storage Door panel towards the top and bottom of the door Using black screws ensure the screws go through into the Stora...