P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
1
6
6
17
12
Pre drill
hole
30mm
screw
20mm
screw
17
Step 1
Parts Needed - No.1 QTY 1
- No.6 QTY 2
- No.12 QTY 2
- No.17 QTY 6
Fix the T-hinges
(No.17)
to each of the Doors
(No.6)
with 4x30mm screws per hinge making sure to
screw into the framing on the rear of the Doors.
Once the T-hinges are fixed into position lay the
Door Panel
(No.1)
flat on the ground fix the door in
position using 3x30mm screws per hinge.
To create a Master and Secondary door fix the Door
Trims (
No.12
) to one of the doors overlapping with
the other door as shown using 3x20mm screws per
trim.
6x20mm Screw
42x30mm Screws
12
Secure the floor
(No. 4)
to the
Floor Blocks (
No.16
) using 6x30mm
screws per floor.
6x30mm Screws
Pre drill
hole
30mm
screw
Step 2
Parts Needed -
No. 4 QTY 1
- No. 16 QTY 3
4
16
16
16
Pre Assembly
Follow the instructions for the 9x9 Corner
Summerhouse (
03DTSHCR0909FGD4TW
),
however
DO NOT
attach the Felt, Rear Cover
Trims or the Fascia Trims.
Not attaching these parts allows the exten-
sion to be fixed in place.
Your building should look as shown.
Содержание 03DTSHPN0409SHPB-V1
Страница 10: ...2 1 3 4...
Страница 11: ...1 2...