P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
1
6
6
15
11
Pre drill
hole
30mm
screw
20mm
screw
15
Step 1
Parts Needed - No.1 QTY 1
- No.6 QTY 2
- No.11 QTY 2
- No.15 QTY 4
Fix the T-hinges
(No.15)
to each of the Doors
(No.6)
with 4x30mm screws per hinge making sure
to screw into the framing on the rear of the Doors.
Once the T-hinges are fixed into position lay the
Door Panel
(No.1)
flat on the ground fix the door
in position using 3x30mm screws per hinge.
To create a Master and Secondary door fix the
Door Trims (
No.11
) to one of the doors overlap-
ping with the other door as shown using 3x30mm
screws per trim.
6x20mm Screw
28x30mm Screws
11
Step 2
Parts Needed- No.4 QTY 1
Place the Floor
(No.4)
up against the
7x7 Corner Summerhouse on a flat,
level surface. Fix into position using
4x60mm screws as shown.
**To position the side shed on the
left, position the floor on the left and
fix in the same way shown.
4x60mm Screws
Pre drill
hole
60mm
screw
4
15
15
15
15
15
Pre Assembly
Follow the instructions for the 7x7 Corner
Summerhouse (
03DTSHCR0707FGD2TW
),
however
DO NOT
attach the Felt, Rear Cover
Trims or the Fascia Trims.
Not attaching these parts allows the exten-
sion to be fixed in place.
Your building should look as shown.
Содержание 03DTSHPN0407DSHSA-V1
Страница 9: ...2 1 3 4...
Страница 10: ...1 2...