background image

P 7

             

Please retain product label and instructions for future reference

             

8

9

9

Step 13

Parts Needed - No.8 QTY 1

 

 

 - No.9 QTY 2

Fix the Cover Trims  

(No.8 and No.9)

 

plus the remaining cover trims from 

the 7x7 Corner Summerhouse into 

place using 3x40mm screws per Trim.

 Fix the Rear Cover trim 

(No.25)

 from 

the 7x7 Summer House using 

3x20mm screws. Ensure it is equally 

spaced across the back panels, and 

covering the panel join

12x40mm Screws

40mm 

screw

Pre drill 

hole

10

10

Step 14

Parts Needed - No.10 QTY 2

Fix the Fascia Trims (

No.10

) plus the 

remaining Fascia Trims from the 7x7 

Corner Summerhouse into place 

using 3x40mm screws per Trim. 

21x40mm Screws

40mm 

screw

Pre drill 

hole

Step 15

Parts Needed- No.14 QTY 2

 

 

- No. 17 QTY 1

Fix two Door blocks 

(No.14)

 to the 

back of the Doors (internally) with 

2x30mm screws per block going 

through the front of the door 

boards and into the block behind.

Fix the Pad Bolt (

No.17

) to one of 

the Doors (

No.6

) using 12x30mm 

screws. 

16x30mm  Screws

30mm 

screw

Pre drill 

hole

17

14 14

16

14

Step 16

Parts Needed- No.14 QTY 2

 

 

- No.16 QTY 2

Fix the Door blocks 

(No.14)

 to the top 

and bottom of the Doors (internally) 

with 2x30mm screws per block going 

through the front of the door boards 

and into the block behind

Fix one Turn Button (

No.16

) to each of 

the Door blocks 

(No.14)

 using 

1x30mm screw per turn button.

6x30mm  Screws

30mm 

screw

Pre drill 

hole

25

Содержание 03DTSHPN0407DSHSA-V1

Страница 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions Fo...

Страница 2: ...1 AI R11MBF1133X1960 V1 Roof QTY 1 AI S11MBPR1143X2050 V1 Door QTY 2 AI S11FBMBZBD479X1680 V1 Gable Top QTY 1 AI S21SHDBPGT1905X301 V1 8 Back Cover Trim 12x40x1825mm QTY 1 S1240 1825mm 9 Front Cover T...

Страница 3: ...t on the ground fix the door in position using 3x30mm screws per hinge To create a Master and Secondary door fix the Door Trims No 11 to one of the doors overlap ping with the other door as shown usin...

Страница 4: ...shown using 4x60mm screws Do not secure the building to the Floor until the roof is fitted 4x60mm Screws 2 Pre drill hole 50mm screw 1 2 3 Step 5 Parts Needed No 3 QTY 1 Fix the Side panel No 3 to the...

Страница 5: ...he roof bearers Fix in place as a shown with 5x50mm screws per roof trim 10x50mm Screws 50mm screw Pre drill hole Step 9 Parts Needed No 5 QTY 1 Place the Roof Panel No 5 on top of the building ensure...

Страница 6: ...L x 1000mm W Sheets 2 3 1 x 3100mm L x 1000mm W Sheet 4 1 x 1700mm L x 1000mm W Sheet 1 Place the felt on top of the roof and align as shown in the diagram ensuring strip 4 overhangs the front of the...

Страница 7: ...mmerhouse into place using 3x40mm screws per Trim 21x40mm Screws 40mm screw Pre drill hole Step 15 Parts Needed No 14 QTY 2 No 17 QTY 1 Fix two Door blocks No 14 to the back of the Doors internally wi...

Страница 8: ...the Turn Buttons No 16 above each of the Doors using 1x30mm screw per turn button 2x30mm Screws 30mm screw Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building h...

Страница 9: ...2 1 3 4...

Страница 10: ...1 2...

Отзывы: