background image

P 2

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

03DTSHPN0407DSHSA-V1

Overall Dimensions:

Width = 1191mm 

Depth = 2076mm 

Height = 2011mm

Base Dimensions: 

Width = 1133mm 

Depth = 1960mm

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Nail Bag

There may be extra screws present in the nail bag 

Please retain product label and instructions for future reference

             

Door Panel QTY 1

AI-01S11SHDD1135X1946-V1

Back Panel QTY 1

AI-S11SHPP1135X1827-V1

Side Panel QTY 1

AI-S11SHPP1905X1671-V1

Floor QTY 1

AI-R11MBF1133X1960-V1

Roof QTY 1

AI-S11MBPR1143X2050-V1

Door QTY 2

AI-S11FBMBZBD479X1680-V1

Gable Top QTY 1

AI-S21SHDBPGT1905X301-V1

8

Back Cover Trim - 12x40x1825mm QTY 1

S1240-1825mm

9

Front Cover Trim - 12x40x1918mm QTY 2

S1240-1918mm

10

Fascia Trim - 12x95x1143mm QTY 2

S1295-1143mm

11

Door Cover Trim - 12x60x780mm QTY 2

S1260-780mm

1

2

3

4

5

6

7

12

Roof Framing - 28x28x1142mm QTY 2

FS2828-1142mm

15

17

14

Door block - 28x28x150mm QTY 4

FS2828-150mm

16

13

Gable Framing - 28x28x1905mm QTY 1

FS2828-1905mm

Pad Bolt QTY 1

PI-07-0035

T-hinge QTY 6

PI-07-0021

Turn Button QTY 4

PI-07-0034

Felt

PI-01-0013

18

50mm Screw x 49 

Felt Tacks x 50

30mm Screw x 52

60mm Screw x 12

40mm Screw x 15 

20mm Screw x 6

Содержание 03DTSHPN0407DSHSA-V1

Страница 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions Fo...

Страница 2: ...1 AI R11MBF1133X1960 V1 Roof QTY 1 AI S11MBPR1143X2050 V1 Door QTY 2 AI S11FBMBZBD479X1680 V1 Gable Top QTY 1 AI S21SHDBPGT1905X301 V1 8 Back Cover Trim 12x40x1825mm QTY 1 S1240 1825mm 9 Front Cover T...

Страница 3: ...t on the ground fix the door in position using 3x30mm screws per hinge To create a Master and Secondary door fix the Door Trims No 11 to one of the doors overlap ping with the other door as shown usin...

Страница 4: ...shown using 4x60mm screws Do not secure the building to the Floor until the roof is fitted 4x60mm Screws 2 Pre drill hole 50mm screw 1 2 3 Step 5 Parts Needed No 3 QTY 1 Fix the Side panel No 3 to the...

Страница 5: ...he roof bearers Fix in place as a shown with 5x50mm screws per roof trim 10x50mm Screws 50mm screw Pre drill hole Step 9 Parts Needed No 5 QTY 1 Place the Roof Panel No 5 on top of the building ensure...

Страница 6: ...L x 1000mm W Sheets 2 3 1 x 3100mm L x 1000mm W Sheet 4 1 x 1700mm L x 1000mm W Sheet 1 Place the felt on top of the roof and align as shown in the diagram ensuring strip 4 overhangs the front of the...

Страница 7: ...mmerhouse into place using 3x40mm screws per Trim 21x40mm Screws 40mm screw Pre drill hole Step 15 Parts Needed No 14 QTY 2 No 17 QTY 1 Fix two Door blocks No 14 to the back of the Doors internally wi...

Страница 8: ...the Turn Buttons No 16 above each of the Doors using 1x30mm screw per turn button 2x30mm Screws 30mm screw Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building h...

Страница 9: ...2 1 3 4...

Страница 10: ...1 2...

Отзывы: