
Please retain product label and instructions for future reference
P13
Step 16
Parts Needed- No.28 QTY 2
Attach the tower bolts
(No.28)
to
the top and bottom of the
secondary door using 4x20mm
screws per bolt.
*Mark the position of the bolt
with a pencil on the framing and
drill a hole to site the bolts.
8x20mm black screws
Pre drill
hole
20mm
screw
28
Step 17
Parts Needed- No.23 QTY 2
Fix the Turn Buttons
(No.23)
above each door (externally)
using 1x20mm black screw per
Turn Button.
2x20mm Black screws.
Pre drill
hole
20mm
screw
23
28
28
Step 18
Parts Needed- No.14 QTY 7
Fix the Cover trims
(No. 14)
to each
corner and over the panel joins,
secure using 3x30mm screws per
cover trim.
Cover trims may need cutting to size
21x30mm Screws.
Pre drill
hole
30mm
screw
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
2ft EXTENSION PACK
Step 18a
8x8 Summer House Parts Needed - No.14 QTY 9
10x8 Summer House Needed - No.14 QTY 11
27x30mm Screws (8x8 Summer House)
33x30mm Screws (10x8 Summer House)
8x8 Summer House
10x8 Summer House
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
*
Cut down
trims to fit
Содержание 03DTSHAX0608FGD4MW-V1
Страница 18: ...2 1 3 4...
Страница 19: ...1 2...