
P 8
P10
8x8 Summer
House
10x8 Summer
House
2ft EXTENSION PACK
Step 9a
8x8 Summer House Parts Needed
- No.5 QTY 2
- No.30 QTY 2
10x8 Summer House Parts Needed
- No.5 QTY 2
- No.30 QTY 4
Place a Roof Panel
(No.5)
and Roof extension
panel
(No.30)
on to one side of the building
making sure the framing in the roof panel sit
firmly within the Gable Top
(No.11)
and on top of
the Ridge Bar
(No.19)
.
From the top, fix directly through the roof panels
(No.5 and
No.30)
and into the ridge bar
(No.19)
below using 5x60mm
screws per roof panel.
**Place Roof Extension panels (No.30) to the back of the
building and keep the Roof Panel (No.5) to the front of the
building**
**Make sure that you have got the roof panels the correct
way round with the recess at the top of the apex as shown
in the diagram.**
**The edges of the roof panels must be flush with the outer
cladding of the Plain Gable Top (No.10).**
Once one side of the roof has been fixed to the ridge
bar, lay the next Roof Panel
(No.5)
on top fo the
builing, using the fixed roofs as a guide and secure to
the ridge bar using 5x60mm screws
Following the lay out of the Roof extensions already
laid on the bulindg, fix the remaining roof extensions
onto the builing and secure to the ridge bar using
2x60mm screws per Roof Extension
It is essential that the ridge bar
(No.19)
and roof panels
framing
pull together when fixed with 60mm screws. You may require
another person pushing the ridge bar
(No.19)
up from below
to achieve this.
HINT - Follow the nailing line of the framing on the roof panel
so that you are more likely to fix into the ridge bar below.
Fix the remaining sides of the roof panels using 40mm
screws, ensuring to go through to the framing below.
(8x8 Summer House)
(10x8 Summer House)
20x40mm Screws
24x40mm Screws
14x60mm Screws
18x60mm Screws
40mm
screw
Pre drill
hole
60mm
screw
30
30
5
5
5
5
30
30
5
5
5
5
30
30
34
30
5
34
34
34
5
30
5
34
2ft EXTENSION PACK
Step 9a Continued
8x8 Summer House Parts Needed
- No.34 QTY 2
10x8 Summer House Parts Needed
- No.34 QTY 4
Once the Roofs have been layed out, fix the
U channel
(No.34)
to the Roof Panel
(No.5)
and the Roof Panel Extension (No.30).
Ensure the U channel is equally spaced over
both roofs framing, secure the U channel
using 6x30mm screws per channel
Repeat for both roof panels
8x8 Summer House-
12x30mm Screws
10x8 Summer House-
24x30mm Screws
a
b
c
a
b
c
a
b
c
Содержание 03DTSHAX0608FGD4MW-V1
Страница 18: ...2 1 3 4...
Страница 19: ...1 2...