P 3
Please retain product label and instructions for future reference
Nail Bag
There may be extra screws present in the nail bag
50mm Screw x 93
20mm Screw x 64
10mm Screw x 8
40mm Screw x 38
30mm Screw x 114
70mm Screw x 9
60mm Screw x 8
Felt Tacks x 270
Pre Assembly
Remove the transportation blocks from
the bottom of each panel before
beginning assembly.
Step 1
Parts needed - No. 20 QTY 1
No. 24 QTY 1
Secure the Door Strip
(No.
24)
with the edges being
flush
to the Door Stop Frame
(No. 20)
using 5x30mm
screws.
5 x 30mm Screws
Pre drill
hole
30mm
screw
20
20
24
24
SIDE VIEW
Step 2
Parts needed - No. 4 QTY 2
No. 11 QTY 1
No. 20 QTY 1
No. 24 QTY 1
Lay all of the required parts on to a
flat level surface and fix the Upper
Door Panel
(No. 11)
in the centre of
the two Front Window Panels
(No.
4)
with 3x50mm screws per side.
The Upper Door Panel should be
flush with the top of the left and
right Panels.
Fix the (already assembled in the
Step 1.) Door Strip
(No. 24)
and the
Door Stop Frame
(No. 20)
to the
bottom of the Front Window Panels
(No. 4)
with 2x50mm screws per
side. The Door Stop Frame should
be flush with the bottom framing of
the Front Window Panels
(No. 4)
.
10 x 50mm Screws
Pre drill
hole
50mm
screw
20
24
4
11
4
Содержание 03DTMBHP0806RFP-V1
Страница 17: ...2 1 3 4...
Страница 18: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...