Please retain product label and instructions for future reference
P 10
Step 18
Parts needed - No. 7 QTY 1
No. 8 QTY 1
Place the remaining set of roof
panels
(No. 7 & 8)
(previously
assembled in Step 10) on to the
Summer House using the same
method mentioned in the previous
step.
7
8
Step 19
Parts needed - No. 13 QTY 3
Secure the Roof bearer B’s
(No. 13)
underneath Roof bearer A
(No. 12)
using 2x60mm screws per bearer
through the previously drilled
holes (in Step 12) up into the roof
panels. Make sure that the Roof
bearer B
(No. 13)
parts fit evenly
under the framing of the roof
panels and that the pointed
corners meet the line that was
drawn in a Step 14.
The underside of the roof should
look as shown.
6x60mm Screws
Pre drill
hole
60mm
screw
13
13
13
Step 20
Once all four roof sides are on the
building, pull the corners together and
secure underneath the roof as shown. Fix
using 3x50mm screws per join.
The Roof bearers may need to be
unscrewed and repositioned to ensure all
the roof panels sit level with each other.
*Roof panels will support each other if
bearers are unscrewed.
Once the panels are secure,
re-screw the bearers if necessary, and
secure the threes Roof Bearers B
(No. 13)
through their centres together with the
Roof Bearer A using 3x70mm screw.
12x50mm Screws
3x70mm Screws
Pre drill
hole
50mm
screw
70mm
screw
13
13
B
A
B
A
Содержание 03DTMBHP0806RFP-V1
Страница 17: ...2 1 3 4...
Страница 18: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...