Window Shutters x4
Step 12
Fix fascias and finials using 40mm
screws. Pre drill holes to avoid
splitting. Ensure to the trap the felt
between the fascia and building.
14 x 40mm screws
13
16
20
40mm
screw
Step 13
WINDOW
WINDOW BOX
Fix the window box underneath the
window screwing through the door gable
into the window box using 4 x 30mm
screws.
Fix the window shutters through the
door gable into the shutter using 4 x
30mm screws per shutter.
30mm
screw
30mm
screw
24 x 30mm Screws
Step 14
Place a window frame cross against the inside of each window.
Position the frame centrally to the window and fix using 4x20mm
screws per frame.
Place the wooden door handle on the outside of the door and use a
60mm screw from the inside to secure. Pre drill hole first to avoid
splitting.
On the inside of the door opening fix the ply triangle door stop to
the bottom left corner using 3x20mm screws.
Fix the butterfly onto to the door using 4 x 10mm screws. Pre drill to
avoid splitting.
15 x 20mm screws
4 x 10mm screws
1 x 60mm screw
26
60mm
screw
23
20mm
screw
21
20mm
screw
22
10mm
screw
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.