background image

Window Shutters x4

Step 12

Fix fascias  and finials  using 40mm 

screws. Pre drill holes to avoid 

splitting. Ensure to the trap the felt 

between the fascia and building.

14 x 40mm screws

13

16

20

40mm 

screw

Step 13

WINDOW

WINDOW BOX

Fix the window box underneath the 
window screwing through the door gable 
into the window box using 4 x 30mm 
screws.

Fix the window shutters through the 
door gable into the shutter using 4 x 
30mm screws per shutter.

30mm 

screw

30mm 

screw

24 x 30mm Screws

Step 14

Place a window frame cross against the inside of each window. 

Position the frame centrally to the window and fix using 4x20mm 

screws per frame.

Place the wooden door handle on the outside of  the door and use a 

60mm screw from the inside to secure. Pre drill hole first to avoid 

splitting.

On the inside of the door opening fix the ply triangle door stop  to 

the bottom left corner using 3x20mm screws.

Fix the butterfly onto to the door using 4 x 10mm screws. Pre drill to 

avoid splitting.

15 x 20mm screws

4 x 10mm screws

1 x 60mm screw

26

60mm 

screw

23

20mm 

screw

21

20mm 

screw

22

10mm 

screw

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Отзывы: