Assembly
Nail Bag & Ironmongery
50mm Screw x 48
40mm Screw x 21
Felt Tacks x 80
20mm Screw x 16
30mm Screw x 69
60mm Screw x 21
10mm Screw x 5
Wooden door
handle
26
Corner
Bracing x2
27
29
Felt
28
Antique Hinge x3
30mm Black Screw x 21
Step 1
Remove
transportation blocks
from the bottom of each panel
before beginning assembly. Each
Panel should have two blocks.
Lay the door gable face up on a flat surface, place the
door within the door aperture. Position the door so that
you have a 12mm gap from the door to the door gable on
all four sides.
Useful tip: Use a12mm thick piece of timber from your
fixing kit within the gaps to ensure the door does not
move.
Once you are happy the door is in the correct position
place a hinge at the top, middle and bottom of the door,
ensuring the screws will go into the framing and using
30mm black screws fix the hinge to the door and the door
gable. Ensure to pre-drill the holes first.
12mm
12mm
21x 30mm black screws
28
Step 2
Place the
floor
on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water can
collect. (See front page on base
requirements).
5
Step 3
Fix the ladder together using
50mm screws, pre drill all screw
holes to avoid the timber spliting.
50mm
screw
16x 50mm screws
14
18
1055mm
Step 4
Fix the 1st floor support bar to the
front gable with 4 x 60mm screws
at a height of 1055mm from the
bottom piece of framing to the
top of the bar as shown in the
diagram.
60mm
screw
4x 60mm screws
15
1