Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
www.merciagardenproducts.co.uk P9
60mm
screw
Step 11
Parts needed -
If you are constructing Set Ups 1 or 2, this
is your final step.
Dependant on which Set up you are
constructing, Locate the Short Rail(s)
(No.5)
onto the Tower Base, as shown in the
illustration.
Ensure the Rail framing is flush to the Tower
Base and Front Post.
Fix the Short Rail
(No.5)
into position using
4x60mm & 2x100mm screws per Short Rail
Please note: You have been supplied with two
short rails, please fit both if constructing set up
1 & 2. If constructing any other set up only the
one rail is required to be installed.
8x60mm Screws
4x100mm Screws
5
1!
2!
Pre drill
hole
50kg
SET UP 1 & 2
SET UP 5 & 6
SET UP 3, 4, 7 & 8
5
5
5
5
100mm
screw
5
Step 12
Parts needed -
Locate the Slide Framing
(No.18)
to
the Tower Base in the gap where the
slide will be fitted.
Ensure the framing is flush to the Top
of the Tower base and centralised.
Fix in place use 3x70mm screws.
Please note: This playhouse and set up
have been used for illustrative
purposes, fit the slide framing to the
opening where the slide will be fitted.
3x70mm Screws
70mm
screw
18
1!
2!
Pre drill
hole
50kg
18
Содержание 02DTTWR0707-V1-PEFC
Страница 13: ...2 1 3 4...
Страница 14: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...