Mercia Garden Products 02DTTWR0707-V1-PEFC Скачать руководство пользователя страница 8

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P8

1!

2!

Pre drill 

hole

50kg

 

Step 8

Parts needed -  

Locate the Ladder Block

 

(No. 13)

 flush to 

the top of the Bunk Floor and  27mm from 

the front of the front post, as shown in the 

diagram.

Fix in place by screwing through the block 

into the tower base using 2x60mm 

screws. 

Please note: This playhouse and set up have 

been used for illustrative purposes, fit the 

ladder block to the side of the tower base to 

which you will be fitting the ladder.

2x60mm screws

60mm 

screw

13

13

27mm

13

50mm 

screw

Step 9

Place the assembled ladder 

between the front post 

(No.11)

 

and the playhouse left hand 

side rail. 

Ensure the ladder fits flush 

with the post and the 

playhouse rail and flat to the 

floor, fix in place using 

4x50mm screws as shown.

Fix in place by screwing 

through the ladder into the 

front post and playhouse side 

rail using 4x50mm screws as 

shown. 

Please note: This playhouse and 

set up have been used for 

illustrative purposes, fit the 

ladder to the side of the tower 

base to which you have fitted the 

ladder block.

4x50mm screws.

1!

2!

Pre drill 

hole

50kg

 

1!

2!

Pre drill 

hole

50kg

 

60mm 

screw

Step 10

Parts needed - 

Locate the Long Rail 

(No.4) 

into the gap 

between the front and central posts. 

Ensure the framing of the rail is flush 

with the front of the Tower base and the  

front post 

(No.11)

 , as shown in the 

illustration.

Fix into position by screwing through 

the rail into the tower base and posts 

using 9x60mm screws.

Please note: This playhouse and set up 

have been used for illustrative purposes, 

fit the long rail to fill the larger gap 

between the centre and front post.

9x60mm Screws

4

1!

2!

Pre drill 

hole

50kg

 

4

Содержание 02DTTWR0707-V1-PEFC

Страница 1: ...richlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you h...

Страница 2: ...W V1 PEFC Playhouse 02DTTWR0707 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHPN0606SFD2W V1 PEFC Playhouse 02DTTWR0707 V1 PEFC Tower 6x6 Pent Playhouse Tower 6x6 Pent Playhouse Tower Slide 6x6 Pe...

Страница 3: ...with no slide SET UP 5 If purchased a slide Ladder on the left and slide on the front right SET UP 3 If purchased a slide Ladder on the left and slide on the right side SET UP 4 If purchased a slide...

Страница 4: ...795 1365mm Ladder Block 44x44x372mm QTY 1 F4444 372mm Slide QTY 1 PI 10 0001 Centre Post 70x70x670mm QTY 1 F7575 670mm 7 8 9 11 12 13 14 15 Long Rail AI 02SR1204X600 V1 Short Rail QTY 2 AI 02SR416X600...

Страница 5: ...SEMBLY www merciagardenproducts co uk P5 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap wit...

Страница 6: ...of approx 18mm between the two Bunk Floors No 2 3 Fix in place by screwing through the Bunk Floor boards into the Tower Base framing using 40mm screws Further secure the Bunk Floor by screwing through...

Страница 7: ...t of the rear post on to the front post and position into the cut out section at the front of the platform as shown Secure using 2x150mm screws per post Fix two corner braces to the front post No 11 a...

Страница 8: ...flush with the post and the playhouse rail and flat to the floor fix in place using 4x50mm screws as shown Fix in place by screwing through the ladder into the front post and playhouse side rail using...

Страница 9: ...s per Short Rail Please note You have been supplied with two short rails please fit both if constructing set up 1 2 If constructing any other set up only the one rail is required to be installed 8x60m...

Страница 10: ...the framing using 2x40mm screws 2x40mm Screws 40mm screw 6 1 2 Pre drill hole 50kg SET UP 5 6 SET UP 3 4 7 8 17 Step 14 Parts needed Locate the Safety Strips No 17 per rail in between the gaps in the...

Страница 11: ...Rail closest to the Slide ensuring it is flush to the front support post Fix using 2x40mm screws per part of the top and bottom This is to help stop any potential hazards when using the slide 2x40mm S...

Страница 12: ...It is recommended that the following checks and maintenance are carried out at the beginning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tigh...

Страница 13: ...2 1 3 4...

Страница 14: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: