Mercia Garden Products 02DTTWR0707-V1-PEFC Скачать руководство пользователя страница 7

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

Please retain product label and instructions for future reference

             

www.merciagardenproducts.co.uk      P7

Step 5

Parts needed -            &            &        

 

With the assembled Platform resting on 

one side, secure one of the Rear Posts 

(No.10)

 to 

the back of the platform. Use 2x150mm screws per 

post and secure through the top of the platform.

 

Secure two corner braces 

(No.12)

 to the  

post using 2x100mm screws per brace. Ensure the 

braces are flush to the rear post and Tower Base. 

Note: the post should be at a 90 degree angle and the 

corner braces should be at a 45 degree angle to the 

platform.

 

To ensure the front post 

(No.11)

 is at the 

correct height, mark the height of the rear post on 

to the front post and position into the cut out 

section at the front of the platform as shown. 

Secure using 2x150mm screws per post.

Fix two corner braces to the front post 

(No.11)

 as 

previously and repeat the previous steps on the 

remaining posts.

Carefully position the platform onto your base 

and check that it is level.

16x100mm Screws

8x150mm Screws

100mm 

screw

150mm 

screw

A

C

B

10

12

11

1!

2!

Pre drill 

hole

50kg

 

C

A

B

11

12

11

12

12

12

10

Step 6

The platform is ready for the 

assembly of the playhouse on top. 

Follow the instructions provided 

with the playhouse. 

Ensure to fix the playhouse to the 

Bunk using the same fixing 

method mentioned in the 

playhouse instructions.

30mm 

screw

Step 7

Parts needed -            &           &           

Slot the steps 

(No.16)

 into the left and 

right ladder side 

(No.14 &15)

Fix in position using 4x30mm screws 

per step.

16x30mm Screws

15

14

16

16

15

14

1!

2!

Pre drill 

hole

Содержание 02DTTWR0707-V1-PEFC

Страница 1: ...richlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you h...

Страница 2: ...W V1 PEFC Playhouse 02DTTWR0707 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHPN0606SFD2W V1 PEFC Playhouse 02DTTWR0707 V1 PEFC Tower 6x6 Pent Playhouse Tower 6x6 Pent Playhouse Tower Slide 6x6 Pe...

Страница 3: ...with no slide SET UP 5 If purchased a slide Ladder on the left and slide on the front right SET UP 3 If purchased a slide Ladder on the left and slide on the right side SET UP 4 If purchased a slide...

Страница 4: ...795 1365mm Ladder Block 44x44x372mm QTY 1 F4444 372mm Slide QTY 1 PI 10 0001 Centre Post 70x70x670mm QTY 1 F7575 670mm 7 8 9 11 12 13 14 15 Long Rail AI 02SR1204X600 V1 Short Rail QTY 2 AI 02SR416X600...

Страница 5: ...SEMBLY www merciagardenproducts co uk P5 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap wit...

Страница 6: ...of approx 18mm between the two Bunk Floors No 2 3 Fix in place by screwing through the Bunk Floor boards into the Tower Base framing using 40mm screws Further secure the Bunk Floor by screwing through...

Страница 7: ...t of the rear post on to the front post and position into the cut out section at the front of the platform as shown Secure using 2x150mm screws per post Fix two corner braces to the front post No 11 a...

Страница 8: ...flush with the post and the playhouse rail and flat to the floor fix in place using 4x50mm screws as shown Fix in place by screwing through the ladder into the front post and playhouse side rail using...

Страница 9: ...s per Short Rail Please note You have been supplied with two short rails please fit both if constructing set up 1 2 If constructing any other set up only the one rail is required to be installed 8x60m...

Страница 10: ...the framing using 2x40mm screws 2x40mm Screws 40mm screw 6 1 2 Pre drill hole 50kg SET UP 5 6 SET UP 3 4 7 8 17 Step 14 Parts needed Locate the Safety Strips No 17 per rail in between the gaps in the...

Страница 11: ...Rail closest to the Slide ensuring it is flush to the front support post Fix using 2x40mm screws per part of the top and bottom This is to help stop any potential hazards when using the slide 2x40mm S...

Страница 12: ...It is recommended that the following checks and maintenance are carried out at the beginning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tigh...

Страница 13: ...2 1 3 4...

Страница 14: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: