background image

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01OVLPA0705SDFW-V1

7x5 Overlap apex shed with single door, fixed windows, solid sheet floor and roof.

01OVLPA0705SDFW-V1-NW

7x5 Overlap apex shed with single door, no windows, solid sheet floor and roof.

01OSBA0705SDFW-V1

6x4 Shiplap apex shed with single door, fixed windows, solid sheet floor and roof.

01OSBA0705SDFW-V1-NW

7x5 Shiplap apex shed with single door, no windows, solid sheet floor and roof.

01SHPA0705SDOW-V1

7x5 Shiplap apex shed with single door, opening windows, T&G floor and roof.

01SHPA0705SDOW-V1-NW

7x5 Shiplap apex shed with single door, no windows, T&G floor and roof.

Refer to the instructions pages for you specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as 

been treated by the correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to 

timber fence panels and garden buildings.

Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos 

mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

14/01/2014

Содержание 01OSBA0705SDFW-V1

Страница 1: ...he case of childrens products independently tested to EN71 level we cannot accept responsibility for your safety whilst erecting or using this product Mercia Garden Products Limited Sutton On Trent Newark Nottinghamshire NG23 6QN www merciagardenproducts co uk CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber ...

Страница 2: ...or Gable Back Gable Plain Side Qty 2 NW only Window Panel FW V1 ONLY Floor Roof x2 Door x2 8 1 2 3 4 5 6 7 9 17 Door Beading Strip 1590mm x2 T Hinge Qty 2 Plastic Window Cill FW V1 ONLY Felt Styrene Qty 2 FW V1 ONLY 18 20 L Bracket Qty 2 16 Turn Button Qty 2 19 15 Eaves Frame 2106mm x2 Nail Bag Felt Tacks x 72 20mm Screw x 8 30mm Black Screw x 2 30mm Screw x 62 50mm Screw x 41 40mm Screw x 48 Remo...

Страница 3: ... diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 3 2 3x50mm Screws Pre drill hole 50mm screw Step 3 9x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 Use for no window buildings 3 Pre drill hole 50mm screw Step 4 8x20mm Screws Place the ridge bar in between the front and back gables Ensure the top corners of the ridge ...

Страница 4: ...ofs to the ridge bar 13 6 30mm screw 12x 30mm Screws 28x 40mm Screws 40mm screw Pre drill hole Pre drill hole Step 6 b Once the roof is fixed attach the building to the floor with 50 mm screws 16x 50mm Screws 50mm screw Pre drill hole 72x Tacks Felt tacks 18 18 Step 7 Cut the felt into 3 sheets at 2230mm and fix onto the roof using felt tacks as shown in diagram ensur ing there is 50mm over hang a...

Страница 5: ...ep 10 16 19 Side View Place the plastic window cill onto the Window Panel in the same way as shown on both diagrams to the left Fit the styrene sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of framing that sit alongside the outside edges of the window with...

Страница 6: ...door gable as shown in the close up view 8x30mm Screws 11 Fix the Turn Button onto the door gable using 1x30mm black screw for each one 2x 30mm Black Screw Step 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back 30mm screw 17 ...

Отзывы: