P 8

Place the floor on a firm and level base, 
ensure the base has suitable drainage free 
from areas where standing water can collect. 
See the front page for base requirments.

Step 1

5

Do not secure the building to the 
floor until the roof is fitted. Fix the 
panels onto the floor using 50mm 
screws in alignment with the floor 
joists

Fix the corners with 50mm screws 
as shown in diagram.

Position the panels so there is equal spacing 
between the floor and cladding on all 4 sides

Step 2

3

2

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

9x50mm Screws

Fix the corners with 50mm 
screws as shown in diagram.

1

4

Use         for no 

window buildings

3

Pre drill 

hole

50mm 

screw

Step 4

8x20mm Screws

Place the ridge bar in between the front 
and back gables. Ensure the top corners 
of the ridge bar sit flush with the top 
points of the door gable. Fix the ridge bar 
to the gable using one L bracket for each 
end.
Fix with 4x20mm screws each 

12

20

20mm 

screw

Pre drill 

hole

Содержание 01OSBA0705SDFW-V1

Страница 1: ...he case of childrens products independently tested to EN71 level we cannot accept responsibility for your safety whilst erecting or using this product Mercia Garden Products Limited Sutton On Trent Newark Nottinghamshire NG23 6QN www merciagardenproducts co uk CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber ...

Страница 2: ...or Gable Back Gable Plain Side Qty 2 NW only Window Panel FW V1 ONLY Floor Roof x2 Door x2 8 1 2 3 4 5 6 7 9 17 Door Beading Strip 1590mm x2 T Hinge Qty 2 Plastic Window Cill FW V1 ONLY Felt Styrene Qty 2 FW V1 ONLY 18 20 L Bracket Qty 2 16 Turn Button Qty 2 19 15 Eaves Frame 2106mm x2 Nail Bag Felt Tacks x 72 20mm Screw x 8 30mm Black Screw x 2 30mm Screw x 62 50mm Screw x 41 40mm Screw x 48 Remo...

Страница 3: ... diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 3 2 3x50mm Screws Pre drill hole 50mm screw Step 3 9x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 Use for no window buildings 3 Pre drill hole 50mm screw Step 4 8x20mm Screws Place the ridge bar in between the front and back gables Ensure the top corners of the ridge ...

Страница 4: ...ofs to the ridge bar 13 6 30mm screw 12x 30mm Screws 28x 40mm Screws 40mm screw Pre drill hole Pre drill hole Step 6 b Once the roof is fixed attach the building to the floor with 50 mm screws 16x 50mm Screws 50mm screw Pre drill hole 72x Tacks Felt tacks 18 18 Step 7 Cut the felt into 3 sheets at 2230mm and fix onto the roof using felt tacks as shown in diagram ensur ing there is 50mm over hang a...

Страница 5: ...ep 10 16 19 Side View Place the plastic window cill onto the Window Panel in the same way as shown on both diagrams to the left Fit the styrene sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of framing that sit alongside the outside edges of the window with...

Страница 6: ...door gable as shown in the close up view 8x30mm Screws 11 Fix the Turn Button onto the door gable using 1x30mm black screw for each one 2x 30mm Black Screw Step 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back 30mm screw 17 ...

Отзывы: