background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Pre drill 

hole

20mm           

screw

Please retain product label and instructions for future reference

             

24

Step 21

Fix the casement stay to the

window then align the fixings

to the window panel.

*Ensure the casement stay fits

onto the fixings before securing

in place.

12x20mm Screws

26

Step 22

Attach the turn buttons to the top

and bottom of the slave door using

1x30mm black screw per turn

button. 

*Ensuring the turn buttons catch

the master door.

2x30mm Black Screws

These Turn buttons help to keep

your doors straight during high

and low levels of moisture

content in the air.

30mm 

screw

Pre drill 

hole

Step 20

 

To fix the lock in place. Screw the Staple

to the Door Gable or Slave door.

Making sure the Hasp is in line with 

the staple and screw into the Door or 

Master door.

To lock the Door, place the Hasp  over the 

Staple and twist into the lock position as 

shown.  

8x30mm screws. 

Pre drill 

hole

30mm 

screw

21

Содержание 01GRODB1008-V4

Страница 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Страница 2: ...ve transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 PI 07 0191 P 2 01GRODB1008 V4 Overall Dimensions Length 3055mm Width 2...

Страница 3: ...lustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 14 13 13 Step 3 Fix the door strips onto the front gable using 4x30mm screws for each strip Ensure that there is a...

Страница 4: ...a P 4 Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window panel and fix into place using 3x30m...

Страница 5: ...a tongue and groove fixing 8x50mm Screws 7 7 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Страница 6: ...3 Place the lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm sc...

Страница 7: ...scia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards to the front of the building using 3x20mm screws per board 9x20mm Screws...

Страница 8: ...12x20mm Screws 26 Step 22 Attach the turn buttons to the top and bottom of the slave door using 1x30mm black screw per turn button Ensuring the turn buttons catch the master door 2x30mm Black Screws...

Отзывы: