background image

Step 1

Lay the Door Panel and Gable Top on a level 

floor place the gable top on top of the door 

panel ensure they are level at the top then fix 

together using 60mm screws. Stagger the 

screws so they do not collide.

8x60mm Screws

Pre drill 

hole

60mm 

screw

5

1

11

Step 2

Line a Gable Strip up to the assembled 

gable  ensuring the bottom of the strip 

lines up with the underneath of the 

door panel framing as shown in the 

illustration and fix in place using 40mm 

screws.

6x40mm Screws

Pre drill 

hole

40mm 

screw

14

13

13

Step 3

Fix the door strips onto the front gable 

using 4x30mm screws for each strip. 

Ensure that there is a 10mm gap between 

the door frame and the strips allowing 

(No.14) to sit flush alongside (No.13).  

12x30mm Screws

Pre drill 

hole

30mm 

screw

6

6

25

Step 4

Fix the T Hinges onto the doors and door 

frame as shown above. Ensure that each of the 

hinges are evenly spaced and screwed into 

the Door framing.

42x30mm Screws

Pre drill 

hole

30mm 

screw

P 3

01GRODB1008-V3

Please retain product label and instructions for future reference

             

Содержание 01GRODB1008-V4

Страница 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Страница 2: ...ve transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 PI 07 0191 P 2 01GRODB1008 V4 Overall Dimensions Length 3055mm Width 2...

Страница 3: ...lustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 14 13 13 Step 3 Fix the door strips onto the front gable using 4x30mm screws for each strip Ensure that there is a...

Страница 4: ...a P 4 Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window panel and fix into place using 3x30m...

Страница 5: ...a tongue and groove fixing 8x50mm Screws 7 7 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Страница 6: ...3 Place the lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm sc...

Страница 7: ...scia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards to the front of the building using 3x20mm screws per board 9x20mm Screws...

Страница 8: ...12x20mm Screws 26 Step 22 Attach the turn buttons to the top and bottom of the slave door using 1x30mm black screw per turn button Ensuring the turn buttons catch the master door 2x30mm Black Screws...

Отзывы: