Step 12
Place the sml roofs onto the gables
as shown in the illustration with the
overhang at the top.
*Ensure the roof framing sits into
the cut out sections and rest on
the framing.
Fix each sml roof section to the
gable using 4x30mm screws
per roof panel.
8x30mm Screws
Pre drill
hole
30mm
screw
8
8
Step 13
Place the lrg roofs onto the gables
as shown in the illustration.
*Ensure the roof framing sits into
the cut out sections and rest on
the framing.
Fix each sml roof section to the
gable using 7x30mm screws
per roof panel.
14x30mm Screws
Pre drill
hole
30mm
screw
Rafter
Roof
panel
100mm
intervals
50mm
Overhang
50mm
screw
Pre drill
hole
Step 14
Once the roof is fixed secure
the building to the floor with
36x50mm screws.
36x50mm Screws
b
b
b
b
b
b
b
b
Step 15
Cut the felt into 4 sheets &
lay onto the roof as shown
in the illustration below,
ensuring there is
approximately 50mm of
overhang around the
building.
Secure the felt into place
using 190x felt tacks at
100mm intervals.
190x Felt tacks