background image

P 7

             

Please retain product label and instructions for future reference

             

Step 13

Parts needed - No. 11 QTY 2

Use 4x30mm Screws to fix each 

door beading strip 

(No. 11)

 

onto 

the door gable 

(No. 1).

 

Ensure that the screw is parallel 

with the door frame when fixing the 

strip to the door gable as shown in 

the close up view.

8x30mm Screws

30mm 

screw

Pre drill 

hole

11

11

Step 14

Parts needed - No. 19 QTY 2

Fix the turn button 

(No. 19) 

onto 

the door gable 

(No. 1) 

using 1x 

30mm screw.

2x30mm Screws

 

30mm 

screw

Pre drill 

hole

19

* The instruction which shows you how to fit the lock is a seperate sheet with the lock *

Step 15

Parts needed - No. 8 QTY 2

Fix one lock block

 (No. 8)

 

to the 

central frame of the door flush to 

the edge of the frame using 40mm 

screws.

Fix the remaining lock block 

(No. 8) 

to the door gable framing central to 

the framing and lock block fixed to 

the door using 40mm screws.

4x40mm Screws

40mm 

screw

Pre drill 

hole

8

8

IMPORTANT:

 Pre-drill before fixing screws.

IMPORTANT:

 Pre-drill before fixing screws.

IMPORTANT:

 Pre-drill before fixing screws.

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 01DTSHAX0806SDSEC-V1

Страница 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions Fo...

Страница 2: ...4mm 4M Capping Felt QTY 1 PI 01 0020 5M Green Felt QTY 1 PI 01 0013 Styrene Window QTY 2 PI 05 0227 Corner Brace QTY 2 PI 07 0012 T Hinge QTY 3 PI 07 0021 Turn Button QTY 2 PI 07 0034 Window Cill QTY...

Страница 3: ...o through the cladding and into the framing behind 21x30mm Tamper Proof Screws IMPORTANT Pre drill before fixing screws Step 2 Parts needed No 6 QTY 2 Place the floor panels No 6 onto a firm and level...

Страница 4: ...ing screws IMPORTANT Pre drill before fixing screws Step 6 Parts needed No 7 QTY 2 Place the Roof Panels No 7 on top of the building making sure the framing in the roof panels sits firmly within the G...

Страница 5: ...internally Ensure the screws go through the floor into the floor bearers 30x50mm Screws Step 9 Parts needed No 14 QTY 1 No 15 QTY 1 Cut the felt No 15 into 2 sheets at 2490mm and fix onto the roof usi...

Страница 6: ...drill hole 21 21 13 13 13 13 Fix 2x window strips No 10 to the framing along the outside edge of the window gap using 2x30mm screws per strip Place the plastic cill No 20 into the window panel as show...

Страница 7: ...nstruction which shows you how to fit the lock is a seperate sheet with the lock Step 15 Parts needed No 8 QTY 2 Fix one lock block No 8 to the central frame of the door flush to the edge of the frame...

Страница 8: ...2 1 3 4...

Страница 9: ...1 2...

Отзывы: