P 7
Please retain product label and instructions for future reference
Step 13
Parts needed - No. 11 QTY 2
Use 4x30mm Screws to fix each
door beading strip
(No. 11)
onto
the door gable
(No. 1).
Ensure that the screw is parallel
with the door frame when fixing the
strip to the door gable as shown in
the close up view.
8x30mm Screws
30mm
screw
Pre drill
hole
11
11
Step 14
Parts needed - No. 19 QTY 2
Fix the turn button
(No. 19)
onto
the door gable
(No. 1)
using 1x
30mm screw.
2x30mm Screws
30mm
screw
Pre drill
hole
19
* The instruction which shows you how to fit the lock is a seperate sheet with the lock *
Step 15
Parts needed - No. 8 QTY 2
Fix one lock block
(No. 8)
to the
central frame of the door flush to
the edge of the frame using 40mm
screws.
Fix the remaining lock block
(No. 8)
to the door gable framing central to
the framing and lock block fixed to
the door using 40mm screws.
4x40mm Screws
40mm
screw
Pre drill
hole
8
8
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Содержание 01DTSHAX0806SDSEC-V1
Страница 8: ...2 1 3 4...
Страница 9: ...1 2...