P 4
Please retain product label and instructions for future reference
Step 4
Parts needed - No. 1 QTY 1
- No. 5 QTY 1
Place the door gable
(No.1)
and the plain
side
(No.5)
onto the floor and fix together
at the corners using 3x50mm screws per
corner.
Do not secure the building to the floor
until the roof has been fitted.
9x50mm Screws
50mm
screw
Pre drill
hole
5
1
Step 5
Parts needed - No. 9 QTY 1
- No. 17 QTY 2
Place the ridge bar
(No.9)
in between the
door and plain gable. Ensure the top of the
ridge bar is flush with the top of the
central framing.
Fix the Ridge bar
(No.9)
to the gables
using a Corner brace
(No.17)
for each end,
and fix into place using 4x20mm screws
per corner brace.
8x20mm Screws
IMPORTANT:
Pre-drill before fixing screws.
20mm
screw
Pre drill
hole
9
17
17
9
17
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
Step 6
Parts needed - No. 7 QTY 2
Place the Roof Panels
(No. 7)
on top of the
building making sure the framing in the roof
panels sits firmly within the Gable Tops
(No.1
and No.2)
and on top of the Ridge Bar
(No. 9)
.
**Make sure that you have got the roof panels
the correct way round with the recess at the top
of the apex as shown in the diagram.**
**The edges of the roof panels must be flush
with the outer cladding of the Gable Tops
(No. 1 and No.2).**
From the top, fix directly through the roof panels
(No. 7)
and into the ridge bar
(No. 9)
below
using 5x60mm screws per roof panel .
It is essential that the ridge bar
(No. 9)
and roof
panel
(No. 7)
framing pull together when fixed
with 60mm screws. You may require another person
pushing the ridge bar
(No. 9)
up from below to
achieve this.
HINT - Follow the nailing line of the framing on
the roof panel so that you are more likely to
fix into the ridge bar below.
10x60mm Screws
60mm
screw
Pre drill
hole
7
7
a
a
a
a
a
a
a
a
a
a
Содержание 01DTSHAX0806SDSEC-V1
Страница 8: ...2 1 3 4...
Страница 9: ...1 2...