P 5
Please retain product label and instructions for future reference
40mm
screw
Pre drill
hole
Step 7
Parts needed - No. 7 QTY 2
Fix the Roofs
(No.7)
to the building using
40mm screws down the side and the
bottom of the roof, ensuring that the
screws go through the framing below.
18x40mm Screws
7
7
Pre drill
hole
50mm
screw
Step 8
Once the roof is fixed attach the building
to the floor with 50mm screws. screw
through the panel framing internally.
Ensure the screws go through the floor
into the floor bearers.
30x50mm Screws
Step 9
Parts needed - No. 14 QTY 1
- No. 15 QTY 1
Cut the felt
(No. 15)
into 2 sheets at
2490mm and fix onto the roof using felt
tacks in 100mm intervals as shown in
diagram ensuring there is 50mm over-
hang around the sides.
Cut a strip from the capping felt
(No.14)
at 2490mm in length and fix over the
centre of the apex using felt tacks as
shown in the diagram ensurring there is
50mm overhang front to back.
100x Felt Tacks
15
14
HANDLE
WITH CARE
1
2
3
4
15
14
Felt
tacks
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
Содержание 01DTSHAX0806SDSEC-V1
Страница 8: ...2 1 3 4...
Страница 9: ...1 2...