P 5
Please retain product label and instructions for future reference
Pre drill
hole
50mm
screw
Step 8
Place floors
(No. 7)
on a firm and level base,
ensure base has suitable drainage free from
areas where standing water can collect. (
see
front page on base requirements
).
Ensure floors are flush to each other and fix
using 8x50mm screws. Alternate fixing
positions along the length of the floors.
*NOTE: The floors do NOT connect by a
tongue and groove fixing.
8x50mm Screws
7
7
3
b
b
b
b
b
b
Pre drill
hole
50mm
screw
a
a
a
Step 9
Place the assembled plain gable
(No. 3)
and first plain side onto the floor
(No. 7)
and fix in place.
Fix the corners with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
3x50mm Screws
a
b
Pre drill
hole
50mm
screw
3
2
a
a
a
a
b
b
b
b
a
a
Step 10
Following the same method outlined
in step 9, attach the next plain side
(No. 3)
& the window side
(No. 2)
on to
the assembly.
Fix the panels with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
6x50mm Screws
a
b
2
a
a
a
b
b
a
a
a
a
a
a
b
b
b
Pre drill
hole
50mm
screw
Step 11
Following the same method outlined
in step 9, attach the door gable & the
remaining window side
(No. 2)
on to the
assembly.
Fix the panels with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
9x50mm Screws
a
b
Содержание 01DTGRODB1008-V4
Страница 10: ...2 1 3 4...
Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...