P 3
01GRODB1008-V3
Please retain product label and instructions for future reference
Step 1
Lay the Door Panel
(No. 1)
and Gable Top
(No. 5)
on a level floor place the gable top on top of
the door panel ensure they are level at the top
then fix together using 60mm screws. Stagger
the screws so they do not collide.
8x60mm Screws
Pre drill
hole
60mm
screw
5
1
11
Step 2
Line a Gable Strip
(No. 11)
up to the
assembled gable ensuring the bottom
of the strip lines up with the underneath
of the door panel framing as shown in
the illustration and fix in place using
40mm screws.
6x40mm Screws
Pre drill
hole
40mm
screw
14
13
13
Step 3
Fix the door strips
(No. 13 & No. 14)
onto the
front gable using 4x30mm screws for each strip
12x30mm Screws
Pre drill
hole
30mm
screw
6
6
25
Step 4
Fix the T Hinges
(No. 25)
onto the doors
(No. 6)
and door frame as shown above. Ensure that
each of the hinges are evenly spaced and
screwed into the Door framing.
42x30mm Screws
Pre drill
hole
30mm
screw
Содержание 01DTGRODB1008-V4
Страница 10: ...2 1 3 4...
Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...