background image

†‡…

‚­ƒ—

   

 –

—
ˆ
‰
™ 
Œ
’Œ
 
Š
š› 

˜ˆœŠ“žœ
ž
Ÿ

—“¡ 

—— 

 †

1

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

2

…

‚­ƒ—“œ
ž—’ 

 
 œŒž

   

 –

—
ˆ
‰
™ 
Œ
’Œ
 
Š
š› 

˜ˆœŠ“žœ
ž
Ÿ

—“¡ 

——
 

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

Содержание 01DTGRODB1008-V4

Страница 1: ...treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative...

Страница 2: ...ransportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 PI 07 0191 P 2 01DTGRODB1008 V4 Overall Dimensions Length 3055mm Width 259...

Страница 3: ...No 11 up to the assembled gable ensuring the bottom of the strip lines up with the underneath of the door panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws P...

Страница 4: ...d fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw a a Pre drill hole Pre drill hole Step 7 Place the window strip 13mm No 16 above the gap in the window panel and fix into place...

Страница 5: ...and first plain side onto the floor No 7 and fix in place Fix the corners with 50mm screws Do not secure the building to the floor until the roof is fixed 3x50mm Screws a b Pre drill hole 50mm screw...

Страница 6: ...raming sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per roof panel 14x30mm Screws Pre drill hole 30mm screw Rafter Roof panel 9 9 5...

Страница 7: ...aming 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 20mm screw Step 18 Fix the barge boards No 16 No 17 to the front of the building using 3x20mm screws per board 9x20mm Screws 17 17 16 30mm...

Страница 8: ...drill hole 30mm screw 21 Pre drill hole 20mm screw Step 21 Fix the casement stay No 26 to the window then align the fixings to the window panel Ensure the casement stay fits onto the fixings before s...

Страница 9: ...el and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and ca...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: