background image

P 7

Please retain product label and instructions for future reference

             

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 01DDPENT1008-V3

Страница 1: ...eriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment...

Страница 2: ...t 27x44x2238mm QTY 3 F2744 2238 PT3 Eaves Frame QTY 4 10x8 28x28x1546mm FS2828 1546 PT3 12x8 28x28x1819mm FS2828 1819 PT3 T Hinge QTY 6 PI 07 0021 Turn Button QTY 1 PI 07 0034 Pad Bolt QTY 1 PI 07 003...

Страница 3: ...tch to the opposite door with 10x30mm screws Measure between the top and bottom of the door to the pad bolt and cut 2x No 9 strips to t secure in place with 2x20mm screws per strip 52x30mm Screws 4x20...

Страница 4: ...w the method outlined in step 4 Place the remaining gable and window panel onto the oor and x using 9x50mm screws 9x50mm Screws 5 2 a a a a a a Pre drill hole 50mm screw Step 7 If you have purchased t...

Страница 5: ...nsure the roofs are ush with the sides of the building 18x30mm Screws Pre drill hole 30mm screw If you have purchased the T G roof and oor option ensure to x the roof to the building using 38x70mm scr...

Страница 6: ...n to t Pre drill hole 30mm screw 9 9 9 9 9 9 Step 13 Measure the gaps at the corners of the building cut 6x No 9 strips to match Once cut secure to the building using 3x30mm screws per strip 18x30mm S...

Страница 7: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Отзывы: