background image

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather

conditions. For the duration of heavy or extended periods of rain, swelling of the

wood panels may occur. Warping of the wood may also occur during excessive

dry spells due to an interior moisture loss. Unfortunately, these processes cannot

be avoided but can be helped. It is suggested that the outdoor building is

sprayed with water during extended periods of warm sunshine and sheltered as

much as possible during rain or snow.

Our buildings are coated with a water based high quality colorant**; this only 

helps to

protect the product during transit and for up to 3 months against mould. To

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the

building is treated with a wood preserver within the first three months of

assembly and thereafter in accordance with the manufactures recommenda-

tions.

Care must be taken to ensure the product is placed on a suitable base

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

03WES0808-V1

8x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda

03WES1008-V1

10x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda

03WES1208-V1

12x8 Summerhouse, T&G Roof and Floor, Double Doors, Opening Window and Veranda

Refer to the instructions pages for you specific product code

Содержание 03WES1008-V1

Страница 1: ...s of assembly and thereafter in accordance with the manufactures recommenda tions Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the bu...

Страница 2: ...upport 27x44x1685mm Qty 2 Fascia 12x95x1549mm Qty 4 Door Strip 12x60x800mm Qty 2 Window Strip 12x45x1055mm Qty 1 Tower Bolt Strip 19x45x140mm Qty 2 Cover Trims 12x30x1680mm Qty 4 Door Beading Strip 12...

Страница 3: ...ure a flush fit Attach window beading with the 25mm glazing pins provided x4 pins per beading When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scr...

Страница 4: ...ace floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Place the two Floor Panels along side each other so that...

Страница 5: ...ace the roof support on top of the roof support block and fix in place with the corner brace using 2x30mm screws at each end 21 22 33 Step 8 Connect two roof panels together using the u channel Lay tw...

Страница 6: ...ce with 50mm screws Pre drill hole 50mm screw 6 4x50mm Screws Step 12 Secure the Veranda rails to the outside edge of the veranda floor and to the building Fix the Veranda support to the front of the...

Страница 7: ...tacks as shown in diagram ensuring there is 50mm overhang around the sides 1 2 3 4 34 Step 15 16x40mm Screws Pre drill hole Fit the fascias to the roof over the felt and secure in place with 40mm scre...

Страница 8: ...mm screws to fix the hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing hinges to the opening window use 4x30mm screws t...

Страница 9: ...ws 30 30mm screw Pre drill hole Step 20 Attach the handle to the external side of the master door using 4x30mm black screws 4x30mm black screws 30mm screw Pre drill hole 32 Step 21 Attach a turn butto...

Отзывы: