11
10
Step 10
Place the shortest roof support bar
at the front of the building, align
with the framing on the door panel
and secure to the door panel and
the roof support bar with 3x
“L” brackets & 12x30mm screws.
Ensure the roof support bar is level
with the top of the building.
Following the same method outlined
in step 9, fix the remaining roof
support block to the rear of the building
making sure that the last roof support
bar sits level with the panels. Secure to
the centre support with 2x”L” brackets
and 8x30mm screws.
2x80mm Screws
20x30mm Screws
30mm
screw
Pre drill
hole
80mm
screw
Step 11
Layout the roof sheet and position
the eaves frames around the edge
as shown in the illustration.
Ensure the framing is flush to the
edge of the sheet and fix into
each eaves frame into place using
30mm screws.
17x30mm Screws
30mm
screw
Pre drill
hole
Step 12
Place the assembled roof section onto
the building, esuring the framing slots
over each side.
Secure into place using 21x40mm
screws making sure to align the
screws with the vertical framing and
along the roof support bar.
*It is recommended to cut the felt
sheets using the roof as a template
before fixing into place.
21x40mm Screws
40mm
screw
Pre drill
hole
Step 12
Secure the building to the floor
using 20x50mm screws, ensuring
to screw through the panel into
the floor bearers.
20x50mm Screws
50mm
screw
Pre drill
hole
P 5
Please retain product label and instructions for future reference
Roof support must be
level with top of framing
12
28
28
Rear roof framing
Rear roof framing
Side roof framing
Side roof framing
Front roof framing