background image

4

25

Step 2

Place the rear panel right onto

the floor.

Fix the panel joint frame to the 

back of the panel using 3x50mm

screws.

3x50mm Screws

Pre drill 

hole

50mm 

screw

5

Step 3

Place the rear panel left onto

the floor.

 

Secure the panel to the 

 

panel joint frame using

 

3x50mm screws.

 

Do NOT screw the building

 

to the floor until the roof

 

is fitted.

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 4

Place the plain & window panel 

onto the floor.

 

Secure the plain panel

 

and the window panel

  

to the rear panels using

 

3x50mm screws.

The window and plain panels can

be placed either side of the

building.

 

Do NOT screw the building

 

to the floor until the roof

 

is fitted.

6x50mm Screws

Pre drill 

hole

50mm 

screw

1

8

8

26

Step 5

Secure the doors to the door

panel using 2x T-hinges per

door, fixing into place using

7x30mm screws per hinge.

Ensure to screw through the

framing.

28x30mm Screws

Pre drill 

hole

30mm 

screw

P 3

Please retain product label and instructions for future reference

             

Содержание 01COR0707-V1

Страница 1: ...must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we can...

Страница 2: ...ect your building MADE IN GREAT BRITAIN Door Panel Window Panel Plain Panel Rear Panel Right Rear Panel Left Floor Roof Sheet Door QTY 2 Roof Support Bar 2650mm Roof Support Bar 1303mm Roof Support Bar 763mm Roof Support Block 210mm QTY 3 Door Block 140mm QTY 2 Eaves Frame 2049mm Eaves Frame 2025mm Eaves Frame 1149mm Qty 2 Eaves Frame 1196mm Fascia 2045mm QTY 2 Fascia 1202mm QTY 2 Fascia 1213mm Co...

Страница 3: ... Step 4 Place the plain window panel onto the floor Secure the plain panel and the window panel to the rear panels using 3x50mm screws The window and plain panels can be placed either side of the building Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws Pre drill hole 50mm screw 1 8 8 26 Step 5 Secure the doors to the door panel using 2x T hinges per door fixing into p...

Страница 4: ...lack Screw 30mm screw 30mm screw Pre drill hole 12 9 Step 8 Place the door panel onto the floor Secure the panel to the the window plain panel using 6x50mm screws Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws 50mm screw Pre drill hole Roof support must be level with top of framing Step 9 Position the larger roof support bar in the centre of the building between the ...

Страница 5: ...nsure the framing is flush to the edge of the sheet and fix into each eaves frame into place using 30mm screws 17x30mm Screws 30mm screw Pre drill hole Step 12 Place the assembled roof section onto the building esuring the framing slots over each side Secure into place using 21x40mm screws making sure to align the screws with the vertical framing and along the roof support bar It is recommended to...

Страница 6: ...ound the building see dotted line 80x Felt Tacks Felt tacks HANDLE WITH CARE 1 2 3 4 Step 15 Fix the cover trims to the building using 3x30mm screws per trim 12x30mm screws 30mm screw Pre drill hole Step 16 Fix the cover trims to the building using 3x30mm screws per trim 6x30mm screws 30mm screw Pre drill hole P 6 Please retain product label and instructions for future reference 22 22 22 22 1 2 3 ...

Страница 7: ...17x40mm screws 40mm screw Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference ...

Отзывы: