TEST
ACTION
APPLICABILITY
3
Turn the ignition off.
Disconnect the Blower Motor Resistor harness connector.
Disconnect the Blower Motor harness connector.
Disconnect the Automatic Temperature Control (ATC) C2 harness connector.
Measure the resistance between ground and each of the Blower Motor Driver circuits
(Low, M1, M2, High).
Is the resistance below 10k ohms on any of the circuits?
All
Yes
→
Repair each circuit with a resistance below 10k ohms for a short
to ground. Remove and inspect the Blower Motor Fuse, and
replace it if necessary.
Perform BODY VERIFICATION TEST - VER 1.
No
→
4
Turn the ignition off.
Remove the Blower Motor Fuse.
Disconnect the Automatic Temperature Control (ATC) C2 harness connector.
Measure the resistance between ground and the Fused B+ circuit.
Is the resistance below 10k ohms?
All
Yes
→
Repair the Fused B+ circuit for a short to Ground. Remove and
inspect the Blower Motor Fuse, and replace it if necessary.
Perform BODY VERIFICATION TEST - VER 1.
No
→
5
Turn the ignition off.
Disconnect the Blower Motor Resistor Block harness connector.
Measure the resistance between Blower Motor Resistor Block cavity 2 and cavity 1.
The approximate resistance should be 1.4 ohms.
Measure the resistance between Blower Motor Resistor Block cavity 2 and cavity 3.
The approximate resistance should be 0.8 ohms.
Measure the resistance between Blower Motor Resistor Block cavity 2 and cavity 4.
The approximate resistance should be 1.6 ohms.
Is the resistance as specified for each circuit?
All
Yes
→
Replace the Automatic Temperature Control (ATC) in accordance
with the Service Information. Remove and inspect the Blower
Motor Fuse, and replace it if necessary.
Perform BODY VERIFICATION TEST - VER 1.
No
→
Replace the Blower Motor Resistor Block in accordance with the
Service Information. Remove and inspect the Blower Motor Fuse,
and replace it if necessary.
Perform BODY VERIFICATION TEST - VER 1.
145
HEATING & A/C
BLOWER STAGE 1 SHORTED LOW (ACTIVE) —
Continued
Содержание Sprinter 2003
Страница 8: ...NOTES viii ...
Страница 22: ...NOTES 14 ...
Страница 23: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 15 ...
Страница 255: ...8 9 3 SWITCHES 8 9 4 SIREN C O M P O N E N T L O C A T I O N S 247 COMPONENT LOCATIONS ...
Страница 256: ...NOTES 248 ...
Страница 267: ...C O N N E C T O R P I N O U T S 259 CONNECTOR PINOUTS ...
Страница 273: ...C O N N E C T O R P I N O U T S 265 CONNECTOR PINOUTS ...
Страница 280: ...NOTES 272 ...
Страница 281: ...10 0 SCHEMATIC DIAGRAMS 10 1 AIRBAG SYSTEM S C H E M A T I C D I A G R A M S 273 SCHEMATIC DIAGRAMS ...
Страница 282: ...10 2 COMMUNICATION 10 2 1 COMMUNICATION K LINES S C H E M A T I C D I A G R A M S 274 SCHEMATIC DIAGRAMS ...
Страница 283: ...10 2 2 CAN BUS NETWORK S C H E M A T I C D I A G R A M S 275 SCHEMATIC DIAGRAMS ...
Страница 284: ...10 3 HEATING A C 10 3 1 AUTOMATIC TEMPERATURE CONTROL ATC S C H E M A T I C D I A G R A M S 276 SCHEMATIC DIAGRAMS ...
Страница 285: ...10 3 2 CABIN HEATER MODULE CHM S C H E M A T I C D I A G R A M S 277 SCHEMATIC DIAGRAMS ...
Страница 286: ...10 3 3 HEATER BOOSTER MODULE HBM S C H E M A T I C D I A G R A M S 278 SCHEMATIC DIAGRAMS 10 3 HEATING A C Continued ...
Страница 287: ...10 4 INSTRUMENT CLUSTER S C H E M A T I C D I A G R A M S 279 SCHEMATIC DIAGRAMS ...
Страница 288: ...10 5 POWER DOOR LOCKS RKE 10 5 1 FRONT DOORS S C H E M A T I C D I A G R A M S 280 SCHEMATIC DIAGRAMS ...
Страница 289: ...10 5 2 SLIDING AND REAR DOORS S C H E M A T I C D I A G R A M S 281 SCHEMATIC DIAGRAMS ...
Страница 291: ...10 6 VEHICLE THEFT SECURITY SYSTEM S C H E M A T I C D I A G R A M S 283 SCHEMATIC DIAGRAMS ...
Страница 292: ...NOTES 284 ...
Страница 294: ...NOTES 286 ...
Страница 296: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757 ...