Assembly of the trampoline Mat
To assemble the trampoline Mat, only need the Spring Loading Tool (# 9) included in this product.
Step 6 - place the Mat
Place the trampoline Mat (#1) on the floor in the Interior of the frame assembled with the Label facing up as shown
in Figure 6. Align the warning labels with any of the trampoline legs, make sure that the warning
l
abels are up. This
makes the installation process easier.
Select a starting point in the frame and name it "zero" point (pick a point that is above a frame leg and facing a
warning label).
Tool - Spring Loaded (# 9)
Trampoline Mat
(# 1)
Zero
FIGURE
6
10