10
3.5
Collect Tools
You will need the following tools to perform an installation:
Phillips
screwdrive
r
Hammer
Drill with
1/4
”
(6.3mm)
bits
3.6
Collect Additional Hardware for Installation
802.3at PoE power source (either
PoE switch or Meraki 802.3at PoE
Injector)
AC Adapter
Network cables with RJ45 connectors
long enough for your particular mounting
or
Содержание MR76-HW
Страница 1: ...Meraki MR76 HW Hardware Installation Guide...
Страница 6: ...6 Access point mounting posts 2x Various mounting holes...
Страница 11: ...10 location...
Страница 15: ...14...