2
OPERATING INSTRUCTIONS
2 - 8
(22) LH
LEVER
Slew superstructure and control arm.
1
Extend arm:
Push lever forwards
2
Retract arm:
Pull lever back.
3
Slew right:
Move lever to right.
4
Slew left:
Move lever to left.
5
STOP:
The lever returns to the center (stop) when
released.
The slew and arm functions can be operated together.
For example, to extend the arm and slew right at the
same time, push the lever forwards to the right.
(23) RH
LEVER
Bucket and large arm controls
1
Lower arm:
Push lever forwards.
2
Raise arm:
Pull lever back.
3
Bucket dump:
Move lever to right.
4
Bucket dig:
Move lever to left to close the bucket.
5
STOP:
The lever returns to the center (stop) when
released.
The arm and bucket can be operated together. For
example, to lower the arm and dump the bucket at the
same time, push the lever forwards to the right.
(24) T
RAVELLING PEDALS
The pedals can be used to travel while digging so the
hands are free.
Pedali
traslazione
1 Arm
extended
2 Arm
retracted
5 Gasket
3 Slew turret right
4 Slew turret left
ISO control diagram
ISO control diagram
5 Gasket
1 Lower arm
3 Dump bucket
2 Raise arm
4 Dig bucket
Travelling
pedals
Содержание IHI 12VXE
Страница 2: ... ...