DISASSEMBLY INSTRUCTIONS
1
2
E-Ring
Middle Gear
Main Cam
Pinch Roller Cam
Joint Gear
P5 Cam
Fig. 2-17-A
NOTE
When you install the Pinch Roller Cam, P5 Cam and Main
Cam, align each marker. (Refer to Fig. 2-17-B)
Pinch Roller Cam
P5 Cam
Main Cam
Marker
Check the hole of Main
Chassis can be seen.
Fig. 2-17-B
2-18: CLUTCH ASS'Y (Refer to Fig. 2-18)
Remove the Polyslider Washer
1
.
Remove the Clutch Ass'y, Ring Spring and Coupling
Gear.
Unlock the 2 supports
2
and remove the Clutch Lever.
1.
2.
3.
2-16: CAPSTAN DD UNIT (Refer to Fig. 2-16)
Remove the Capstan Belt.
Remove the 3 screws
1
.
Remove the Capstan DD Unit.
1.
2.
3.
• Screw Torque: 5
±
0.5kgf•cm
Fig. 2-16
2-17: MIDDLE GEAR/MAIN CAM (Refer to Fig. 2-17-A)
Remove the Polyslider Washer
1
, then remove the
Middle Gear.
Remove the E-Ring, then remove the Main Cam, P5
Cam and Pinch Roller Cam.
Remove the Polyslider Washer
2
, then remove the
Joint Gear.
1.
2.
3.
Capstan DD Unit
Capstan Belt
1
1
1
Fig. 2-18
1
Clutch Ass'y
Ring Spring
Coupling Gear
Clutch Lever
2
2
B2-4
2-15: AHC ASS'Y/CYLINDER UNIT ASS'Y
(Refer to Fig. 2-15)
Unlock the support
1
and remove the AHC Ass'y.
Remove the 3 screws
2
.
Remove the Cylinder Unit Ass'y.
1.
2.
3.
When you install the Cylinder Unit Ass'y, tighten the
screws from (1) to (3) in order while pulling the Ass'y
toward the left front direction.
NOTE
1
AHC Ass'y
Cylinder Unit Ass'y
2
2
2
• Screw Torque: 3
±
0.5kgf•cm
Fig. 2-15
(1)
(3)
(2)
Содержание MVR4046A
Страница 53: ...M4C9 A6B B024009 SPEC NO O R NO...