18 of 39 20141119-Ver1
Step 7
.
Firmly seat the valve nozzle into the burner venture. Make sure the Valve
outlet (orifice) is inserted
STRAIGHTLY
into the burner tube as shown.
Attach side burner front panel to side burner assembly and main burner control
panel by using the removed bolts then tighten the bolts.