![Mellanox Technologies SX1012 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/mellanox-technologies/sx1012/sx1012_user-manual_1768396025.webp)
Rev 1.4
28
Mellanox Technologies
Installing the system slides on the system
Step 1.
Place the ESD mat on the floor where you will be working, and put on the ESD strap. Make
sure the ESD strap is touching your skin and that the other end is connected to a verified
ground.
Step 2.
Screw the two systems mounted rails to the system, using six flat head screws per rail. The
recommended torque is 0.7±0.1 Nm.
Figure 12: Screw on the System Mounted Rails
Install the two system frame into the rack.
Step 1.
Slide the frame slides into the frame.
Содержание SX1012
Страница 24: ...Installation Rev 1 4 27 Mellanox Technologies Figure 11 Installation Kit Parts for a Side by Side Installation...
Страница 35: ...Rev 1 4 38 Mellanox Technologies Figure 24 SFP Removal and Insertion Tool...
Страница 54: ...Interfaces Rev 1 4 57 Mellanox Technologies Figure 36 Pull out Tab...
Страница 76: ...Rev 1 4 111 Mellanox Technologies 5 6 45 C 113 F 8 3 7 8 9 10 11 12...
Страница 79: ...Rev 1 4 114 Mellanox Technologies 3 4 5 6 7 8 9 10 InfiniBand 45 C 113 F 8 3 PSU InfiniBand...
Страница 92: ...Rev 1 4 127 Mellanox Technologies 4 5 6 7 8 9 10 InfiniBand 45 C 113 F 8 3 InfiniBand...