MELER GLUING SOLUTIONS
4-20
MELTER OPERATION
To activate the start-up status, all of the following conditions must be met:
• That the signal from the main machine reaches input E2 and its value
is not 0.
• That the input for pumping permission (E4) at central control is activated, as
pumping is not possible unless the equipment temperature is OK.
• That pumping is enabled with the pumping ON-OFF button (red LED is
turned off).
• If the external ‘ok’ mode (start-stop) is selected, the external ‘ok’ input
(E3) must be activated.
• That the field MAXIMUM RPM is not set to zero (this field is available on
the control card ‘User configuration menu’).
• That the failure input is not activated (E5), in which case starting the
pump would be impossible. In case of the pump be operating and this
input is activated, pumping will cease immediately.
The system will wait for the main machine to send the pumping activation
and rotation speed signals. When this signal has been received, if a speed has
been previously set, this value will appear on the display and the pump will
start to rotate at the indicated speed.
If not, the rotation speed must be adjusted to the value required for the
application. There are three ways to do this:
1. Change the voltage applied from the main machine.
2. Change the full scale (see section ‘1. MAXIMUM RPM’ ‘User
configuration menu’).
3. Modify the speed ramp (see section ‘Configuring speed ramp’).
Keeping the ‘Vin’ key pressed will show the voltage sent by the main machine.
The pump will stop whenever:
• The control card is disabled with its ON/OFF button.
• The pumping ON-OFF button is pressed (red LED is illuminated).
• When the pumping permission input is deactivated (E3).
• When a variator error signal is activated (E5).
• When the MAXIMUM RPM ALARM TIME appears.
• When the MINIMUM RPM ALARM TIME appears.
• When the voltage signal from the main machine is zero.
The maximum full scale for admissible revolutions is 100 (we recommend
working at speeds of not less than 10 rpm and not greater than 80 rpm).
The full scale can be adjusted by reducing this value in percentage terms. To
make adjustments consult the ‘User configuration menu’, ‘1. MAXIMUM RPM’.
The pump control card is designed with certain parameters programmed at
Meler that can be modified if necessary to meet your requirements.
Modifications may be made through the ‘User configuration menu’ and
programming speed ramp menus.
Содержание MACRO 200
Страница 1: ...ADHESIVE MELTER MACRO 200 INSTRUCTIONS MANUAL MA 5068 ENG 221220 GLUING SOLUTIONS ...
Страница 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 16: ...FOCKE MELER GLUING SOLUTIONS 2 4 INTRODUCTION Main components 10 10 12 8 14 13 11 15 1 2 3 7 6 9 4 5 5 ...
Страница 32: ...FOCKE MELER GLUING SOLUTIONS INSTALLATION 3 12 This page is intentionally left blank ...
Страница 66: ...FOCKE MELER GLUING SOLUTIONS 5 8 MAINTENANCE This page is intentionally left blank ...
Страница 68: ...FOCKE MELER GLUING SOLUTIONS 6 2 TECHNICAL CHARACTERISTICS Dimensions Macro 200 1480 1120 875 1825 ...
Страница 70: ...FOCKE MELER GLUING SOLUTIONS 6 4 TECHNICAL CHARACTERISTICS This page is intentionally left blank ...
Страница 71: ...ELECTRICAL DRAWINGS 7 1 MA 5068 ENG MACRO 200 INSTRUCTIONS MANUAL 7 ELECTRICAL DRAWINGS ...
Страница 72: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 74: ...FOCKE MELER GLUING SOLUTIONS 8 2 PNEUMATIC DIAGRAM This page is intentionally left blank ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST This page is intentionally left blank ...