MTV1000 Ventilator System
33
User’s Manual
5.
Getting Started with MTV1000
5.1.
General Operation Sequence
No.
Item
Figure
Description
1
Preparing
patient circuit
and accessories
Refer to “Installation Guide according
to Circuit Type”
Connect
Patient
circuit
and
appropriate accessories to the
product.
2
Preparing power
A.
Connect power cord to AC
power inlet. AC commercial
power LED is turned on.
B.
Position power switch at stand-
by symbol.
C.
System fail buzzer sound is
created.
3
Turning on power
When stand-by switch is pushed for
two seconds, power is normally
supplied and system fail sound
disappears. Wait for preparation of
various sensors.
Screen state: “Initial” word is
displayed at first. Afterwards
“Ready” appears.
CAUTION
Buzzer alarm sound is created when power switch is positioned at stand-by.
If there is no buzzer sound, check the problem in power supply and fuse.