Operating instructions, Integrated Reverse Osmosis, GiO-Module
Datei:BA_GiO-Modul_9661928_EN_2008-04.docx
9661928
10/14
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
3.6
Connection's plan - GiO-Modul
ET 15-M OS / DV200.2 / FV130.2 / FV250.2 / DV270.2 / UPster H 500
M2
Supply - untreated
water
Drain - concentrate
Clean water outlet
Connection's bush
electrical cable
Machine
Cover
connection's hose /
electrical cable
Waste
water
horse
Drain set
Towards local drain pipe see
technical sheet
For connection do not use more
than three 90° bends
(T
ran
s
pa
re
nt
hos
e)
Pedestal enclosed
Connection set
(Reinforced hose)
Black plastic hose
Untreated water - re-
move
(Reinforced hose)
Option
(Connection BA
system separa-
tor as per EN
1717)
Содержание GiO Module
Страница 14: ......