background image

20

Print quality and changing paper

The printer cover is removed by turning the two fasteners through a quarter turn and pulling the panel off. 

The printer ribbon may need to be moved on to improve print quality. To do this, remove the printer cover and turn the 
right hand rotary winder in direction indicated on the ribbon case. To change the printer ribbon, simply press the ribbon 
assembly where it says, “PUSH EJECT,” to remove the old ribbon and replace with a new one. The part is an Epson 
ERC-09, Megger part number 25995-002.

Paper is fed into the housing with the lose paper facing the rear of the 
instrument. Ensure that the paper is neatly cut and not curled up at 
the end.

 

Holding the end of the paper roll, insert the paper under the cross bar and into the printer slot as shown (blue arrows) 
in the drawing opposite. Press the print feed key repeatedly until the paper is just visible feeding through the print 
mechanism. 

Replace the printer front cover by first locating it at the base of the panel and secure it with the fasteners which are 
turned back a quarter turn to secure the panel in place. Finally press the paper feed button to advance the paper 
through the front cover paper slot.

Vessel and Electrodes

The oil test vessel and electrodes require no maintenance other than 
cleaning. Electrodes can be unscrewed and replaced with another shape 
electrode. Electrodes should be examined regularly to ensure no pitting has 
occurred and the electrodes renewed where pitting is evident. 

The instrument includes a built in electrode cleaning function which can 
be activated from the tools menu. This function will perform 24 sequential 
breakdowns to remove deposits on electrode surfaces.

VCM100D/VCM80D

The VCM100D/VCM80D are not user serviceable items but may require periodic cleaning using a clean cloth dampened 
with Isopropyl Alcohol (IPA). 

Test vessel motorised stirrer

Megger’s motorised stirrer is integrated into a modified lid assembly and simply replaces the vessel lid. Power is 
connected via a flush mounted rear insert and is disconnected as the stirrer assembly is lifted. This unit is not user 
serviceable. 

Содержание OTS 60PB

Страница 1: ...1 M OTS80PB OTS60PB OTS100AF OTS80AF OTS60AF Oil Test Set USER GUIDE...

Страница 2: ...ectly fitted on the support horns in the test chamber Replacement fuses must be of the correct type and rating If batteries are fitted the 12 VDC charger must only be powered from a negative earthed v...

Страница 3: ...ompanying notes F Danger high voltage risk of electrical shock d DC voltage a AC voltage c Equipment complies with current EU Directives u Earth terminal f Fuse USB terminal Equipment complies with C...

Страница 4: ...Set favourite test standards 16 Performing a breakdown test 16 Test in progress 16 Test results 17 Custom tests 18 Basic memory functions 19 Transfer results to USB flash drive 19 Print quality and ch...

Страница 5: ...check the electrode condition and gap daily because it is a critical parameter in breakdown voltage testing Flat anodised Aluminium gap setting gauges are supplied in popular sizes to facilitate elect...

Страница 6: ...notes etc Alpha characters are entered by repetitive pressing on a key the same way as text is entered in modern cellular telephones The AF models also have the ability to use a USB barcode reader to...

Страница 7: ...ng the dielectric strength of high voltage insulating liquids such as the insulating oils used in transformers switchgear and other electrical apparatus The dielectric breakdown voltage is a measure o...

Страница 8: ...VGA display 2 On off LED 3 External power LED icon 4 TEST button with associated red warning LED 5 USB socket 6 Navigation keypad with OK select button 7 ON OFF OTS AF models item description 1 3 5 in...

Страница 9: ...tion is identified as item 1 in the illustration Attention must be paid to product warnings and markings Line power is applied via an IEC socket 2 and is fused 3 On all PB models the internal batterie...

Страница 10: ...ead the section in this document entitled Instrument Operation before powering up the Oil Test Sets for the first time Connect line power Turn on the instrument Follow the instrument setup procedure d...

Страница 11: ...he test vessel with the sample oil it is most important to ensure it is immediately filled with the oil sample to be tested Any significant delay even a few minutes may result in the oil film on the v...

Страница 12: ...tic in use so particles would naturally fall to the bottom where they are unlikely to cause a problem So in static use applications an oil sample would not usually be stirred during testing The use of...

Страница 13: ...The voltage check test is accessed from the Tools tab window Test vessel motorised stirrer Unpack the optional motorised stirrer assembly from its box and fit the stirrer shaft to the underside of the...

Страница 14: ...kdown Users can print save recall delete and download results to a USB drive from the file window The Information window offers details about the instrument software configuration version as well as a...

Страница 15: ...right buttons adjust brightness with a bar indicator showing brightness percentage The OK button is used to set brightness after adjustment and subsequent return to the settings window The following...

Страница 16: ...l setup with the selected standard test the test identification or asset ID comprised of an asset number and two digit serial number the type of oil required electrode gap electrode shape and finally...

Страница 17: ...ly smaller so a slider function enables the user to navigate through the result and print it if required All screen based test results accommodate 10 tests but tests with less than 10 results use only...

Страница 18: ...ariables that control a breakdown test Each variable is user settable simply navigate down to the required setting press the OK button and proceed to change the value as required For numeric entry on...

Страница 19: ...here large numbers of file are present In the delete function window the user can select all deselect all or select one file at a time Select a single file by navigating to the file blue highlight and...

Страница 20: ...rst locating it at the base of the panel and secure it with the fasteners which are turned back a quarter turn to secure the panel in place Finally press the paper feed button to advance the paper thr...

Страница 21: ...instructions given in the relevant test specification or in the case of no instructions cleaned with a small volume of the next sample of oil to be measured Care for OTS electrodes Brass electrodes s...

Страница 22: ...PB model option only Lead Acid 2 x 12 V 4 Ah or NiMH 24 V 2 Ah DC power supply PB model only 12 VDC 60 VA fitted with battery option used to charge battery only Internal printer optional Dot matrix i...

Страница 23: ...ge 0 C to 40 C Storage temperature range 30 C to 70 C Operational humidity range 50 RH at 20 C Storage humidity range 93 RH at 40 C Safety The meter is only approved for use with Megger oil test sets...

Страница 24: ...01 102 n ASTM alternative propeller shaft assembly 1007 153 n IEC alternative propeller shaft assembly 1007 154 n Large red impeller OTS super user kit 1007 467 Included accessories n Vessel 400 ml as...

Страница 25: ...e securely strapped to a pallet Please note that damage caused in transportation due to poor packaging may invalidate a warranty claim Instrument repair and spare parts For service requirements contac...

Страница 26: ...lacement should be performed only by a Megger authorised repair agent who will correctly dispose of the spent battery For end of life disposal only the sealed lead acid batteries are located behind th...

Страница 27: ...AB Eldarv gen 4 Box 2970 SE 187 29 T BY T 46 8 510 195 00 F 46 8 510 195 95 E SVinfo megger com Schweiz Megger AG Ob Haselweg 630 5727 Oberkulm Aargau T 41 62 768 20 30 F 41 62 768 20 33 Thailand Megg...

Отзывы: